Sec. 17. The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.
As added by P.L.35-2001, SEC.7.
Structure Indiana Code
Title 14. Natural and Cultural Resources
Article 30. River Basin Commissions
Chapter 4. Upper Wabash River Basin Commission
14-30-4-2. "Commission" Defined
14-30-4-3. "Participating County" Defined
14-30-4-5. "Upper Wabash River Basin" Defined
14-30-4-7. Designation as Participating County
14-30-4-9. Designation of Member; Revocation
14-30-4-11. Reimbursements; per Diems
14-30-4-13. Cooperative Agreements
14-30-4-14. Flood Control Plans
14-30-4-15. Plans; Public Hearings; Approval