Sec. 27. In developing a plan to improve water quality or mitigate flooding in the part of the basin described in a cooperative agreement entered into under section 26 of this chapter, the commission shall determine the best method and manner of improving water quality or mitigating flooding, giving consideration to the following:
(1) The increase infiltration method.
(2) The channel improvement method.
(3) The wetland restoration method.
(4) Flood plain regulation.
(5) All nonstructural methods.
As added by P.L.138-2018, SEC.8.
Structure Indiana Code
Title 14. Natural and Cultural Resources
Article 30. River Basin Commissions
Chapter 3. St. Joseph River Basin Commission
14-30-3-3. "Participating County"
14-30-3-4. "St. Joseph River Basin"
14-30-3-5. Separate Municipal Corporation
14-30-3-6. Participating County; Designation
14-30-3-7. Boundary Certification
14-30-3-13. Advisory Committee
14-30-3-15.5. Electronic Meetings
14-30-3-17. Capacity to Sue or Be Sued
14-30-3-20. Government Officials Attending Meetings and Advising
14-30-3-21. Interstate Compact With Michigan
14-30-3-22. Grants and Appropriations
14-30-3-24. Appropriations to Carry Out Commission's Responsibilities
14-30-3-25. Expenditures; Deposits
14-30-3-26. Political Subdivision Cooperative Agreement With Commission
14-30-3-27. Determination of Best Method and Manner
14-30-3-28. Public Meeting Concerning Plan to Improve Water Quality or Mitigate Flooding
14-30-3-29. State Approval of Plan
14-30-3-31. Commission Acquisition Powers; Restriction of Construction in Flood Plains