Indiana Code
Chapter 2. Maumee River Basin Commission
14-30-2-15. Flood Control

Sec. 15. In developing the plan, the commission shall determine the best method and manner of establishing flood control, giving consideration to the following:
(1) The reservoir method.
(2) The channel improvement method.
(3) The levee method.
(4) Flood plain regulation.
(5) All nonstructural methods.
[Pre-1995 Recodification Citation: 36-7-6.1-14.]
As added by P.L.1-1995, SEC.23.