Indiana Code
Chapter 8. Lakes; Changes in Levels
14-26-8-62. Petition Filed Under Ic 36-9-27; Court Proceedings

Sec. 62. (a) If a petition is filed under section 61 of this chapter for the construction, reconstruction, alteration, repair, or recleaning of a drainage ditch that extends to or within one hundred sixty (160) rods of a freshwater lake and has a bottom depth lower than the average normal water level of the lake and the petition does not request the construction of a dam, other structure, diversion ditch, pumping station, or other appurtenance to protect and preserve the water level of each lake likely to be affected:
(1) twenty percent (20%) of the owners of land abutting or within four hundred forty (440) yards of the shoreline or water line of the lake;
(2) a county in which the lake lies; or
(3) the department;
may file a petition addressed to the court having jurisdiction any time before the court order granting the petition for the drainage project to include a dam, other structure, diversion ditch, pumping station, or other appurtenance necessary to protect and preserve the water level of the lake.
(b) Upon receipt of a petition filed under subsection (a), the court shall set a date for a hearing. On that date the court shall hear all evidence submitted regarding the practicability and public need of a dam, other structure, diversion ditch, pumping station, or other appurtenance to protect and preserve the water level of each lake likely to be affected.
(c) If the court rules that the additional construction is necessary, the same procedure shall be followed for inclusion as if the additional construction were included in the petition for the drainage work.
(d) If the court rules adversely on the practicability or public need of a dam, other structure, diversion ditch, pumping station, or other appurtenance, an appeal may be taken from the final judgment of the circuit or superior court to the supreme court or the court of appeals within thirty (30) days.
[Pre-1995 Recodification Citation: 13-2-18-23(b), (c).]
As added by P.L.1-1995, SEC.19.

Structure Indiana Code

Indiana Code

Title 14. Natural and Cultural Resources

Article 26. Lakes and Reservoirs

Chapter 8. Lakes; Changes in Levels

14-26-8-1. Applicability of Chapter

14-26-8-2. "Shoreline or Water Line" Defined

14-26-8-3. Petition for Control Dam or Other Structure to Maintain Lake Level

14-26-8-4. Contents of Petition

14-26-8-5. Lake Lying in Two or More Counties

14-26-8-6. Bond to Accompany Petition

14-26-8-7. Docketing of Petition; Notice of Hearing

14-26-8-8. Viewers; Determination

14-26-8-9. Viewers; Appointment and Qualifications

14-26-8-10. Restrictions on County Commissioners as Viewers

14-26-8-11. Remonstrance or Objection; Time Requirements

14-26-8-12. Remonstrance or Objection; Dismissal of Defective Petition

14-26-8-13. Replacement of Disqualified Viewers

14-26-8-14. Objections to Viewers; Time Requirements

14-26-8-15. Objections to Viewers; Disqualification

14-26-8-16. Dismissal of Petition

14-26-8-17. Referral of Petition to Viewers

14-26-8-18. Inspection and Report by Viewers

14-26-8-19. Viewers' Findings; Dismissal of Petition

14-26-8-20. Viewers' Findings; Referral to County Surveyor

14-26-8-21. Surveyor; Preliminary Report; Plans; Specifications

14-26-8-22. County Surveyor

14-26-8-23. Requirements of Assessments of Benefits or Damages

14-26-8-24. Apportionment of Costs of Improvements

14-26-8-25. Surveyor; Notice of Hearing

14-26-8-26. Surveyor; Hearing; Final Report

14-26-8-27. Remonstrance Against Surveyor's Final Report; Time Requirements; Contents

14-26-8-28. Remonstrance Against Surveyor's Final Report; Order to Amend or File New Report

14-26-8-29. Remonstrance Against Surveyor's Final Report; New Report

14-26-8-30. Remonstrance Against Surveyor's Final Report; Trial of Facts

14-26-8-31. Remonstrance Against Surveyor's Final Report; Modification of Assessments

14-26-8-32. Remonstrance Against Surveyor's Final Report; Confirmation of Assessments

14-26-8-33. Remonstrance Against Surveyor's Final Report; Dismissal of Proceedings

14-26-8-34. Approval of Assessments Where No Remonstrance Filed

14-26-8-35. Appeal From Approval and Confirmation of Assessments

14-26-8-36. Contracts for Construction of Improvements; Notice; Bidding

14-26-8-37. Contractor's Bond; Requirement

14-26-8-38. Contractor's Bond; Default

14-26-8-39. Contractor's Bond; Action on Bond

14-26-8-40. Contractor's Bond; Aggregate Liability of Surety

14-26-8-41. Contracts for Construction of Improvements; Court Approval

14-26-8-42. Contractor's Final Report

14-26-8-43. New Assessments Where No Contract Let

14-26-8-44. Payment of Costs of Improvements

14-26-8-45. Surveyor; Traveling Expenses; Compensation; Bond

14-26-8-46. Viewers; Expenses

14-26-8-47. Attorney's Fees

14-26-8-48. Verified Bill; Partial Payment; Full Payment

14-26-8-49. General Lake Improvement Funds

14-26-8-50. Levy of Real Property Tax

14-26-8-51. County Surveyor

14-26-8-52. Auditor; Notice of Assessments

14-26-8-53. Auditor; Extension of Assessments Upon Duplicate

14-26-8-54. Assessments Less Than $25

14-26-8-55. Assessments as Liens; Collection of Assessments

14-26-8-56. Nonpayment of Assessments; Sale of Land

14-26-8-57. Nonpayment of Assessments; Public Land

14-26-8-58. Assessments as Liens; Priority; Payment; Cancellation

14-26-8-59. Lien for Labor and Materials

14-26-8-60. Liability of Surveyor on Bond

14-26-8-61. Petitions Filed Under Ic 36-9-27; Duties of Viewers and County Surveyors

14-26-8-62. Petition Filed Under Ic 36-9-27; Court Proceedings

14-26-8-63. Petition Filed Under Section 62 of This Chapter; Additional Assessments

14-26-8-64. Elevation of Lake Levels