Sec. 2. As used in this chapter, "dewatering well" means a temporary water well that:
(1) is used as part of a construction project to remove water from a surface or subsurface area; and
(2) ceases to be used upon completion of the construction project or shortly after completion of the project.
[Pre-1995 Recodification Citation: 13-2-2.5-2(e).]
As added by P.L.1-1995, SEC.18.
Structure Indiana Code
Title 14. Natural and Cultural Resources
Article 25. Water Rights and Resources
Chapter 4. Emergency Regulation of Ground Water Rights
14-25-4-3. "Nonsignificant Ground Water Withdrawal Facility"
14-25-4-6. "Significant Ground Water Withdrawal Facility"
14-25-4-9. Ground Water Emergency; Based on Investigation
14-25-4-10. Ground Water Emergency; Based on Other Evidence
14-25-4-12. Restrictions on Withdrawal of Ground Water
14-25-4-14. Ground Water Emergency; When Effective; Notice
14-25-4-15. Effect on Civil Right of Action
14-25-4-16. Violations; Injunctions
14-25-4-18. Measure of Compensation
14-25-4-19. Refusal of Compensation
14-25-4-20. Ground Water Emergency; Temporary Provision of Potable Water
14-25-4-21. Nonsignificant Ground Water Withdrawal Facilities to Comply With Rules