Sec. 1. The rates and charges for a waterworks may be determined based on the following:
(1) A flat charge for each connection.
(2) The amount of water consumed.
(3) The size of the meter or connection.
(4) Whether the property served has been or will be required to pay separately for the cost of any of the facilities of the works.
(5) A combination of these or other factors that the board determines is necessary to establish just and equitable rates and charges.
[Pre-1996 Recodification Citation: 13-3-2-22(a).]
As added by P.L.1-1996, SEC.16.
Structure Indiana Code
Article 26. Regional Water, Sewage, and Solid Waste Districts
13-26-11-2. Sewage Works; Campgrounds; Youth Camps
13-26-11-2.1. Campground Rates; Appeal to Utility Regulatory Commission
13-26-11-3. Solid Waste Disposal
13-26-11-4. Services of Water, Sewer, or Solid Waste Disposal
13-26-11-5. Billing and Collection
13-26-11-6. Sewage Works Beneficial to Lots, Land, or Buildings
13-26-11-7. Connection Charges; Liens
13-26-11-13. Ordinance Establishing Rates and Charges; Schedule; Notice; Objections; Hearing; Appeal
13-26-11-14. Extension of Rates and Charges to Cover Additional Premises; Changes or Readjustments