Indiana Code
Chapter 3. Powers and Duties Concerning Water Pollution Control
13-18-3-12. Adoption of Rules Waiving Requirement of Submission of Plans

Sec. 12. The board shall adopt rules providing that whenever a person submits plans to a unit concerning the design or construction of:
(1) a sanitary sewer or public water main, if:
(A) a professional engineer who is registered under IC 25-31 prepared the plans;
(B) the unit provided for review of the plans by a qualified engineer and subsequently approved the plans; and
(C) all other requirements specified in rules adopted by the board are met; or
(2) a sanitary sewer extension for and within a subdivision, if:
(A) a qualified professional surveyor who is registered under IC 25-21.5 prepared the plans;
(B) the subdivision is being laid out or having been laid out by the professional surveyor subject to IC 25-21.5-7;
(C) the unit provided for review of the plans by a qualified engineer and subsequently approved the plans; and
(D) all other requirements specified in rules adopted by the board are met;
the plans are not required to be submitted to any state agency for a permit, permission, or review, unless required by federal law.
As added by P.L.104-1998, SEC.1. Amended by P.L.241-1999, SEC.1; P.L.133-2012, SEC.127; P.L.57-2013, SEC.10; P.L.113-2014, SEC.70.

Structure Indiana Code

Indiana Code

Title 13. Environment

Article 18. Water Pollution Control

Chapter 3. Powers and Duties Concerning Water Pollution Control

13-18-3-1. Duties of Board

13-18-3-2. Adoption of Rules to Implement Federal Acts; Designation of Outstanding State Resource Waters; Antidegradation Review of Certain Applications; Classification of All State Waters

13-18-3-2.1. Deadline for Department to Complete Antidegradation Review in Certain Circumstances; Extension

13-18-3-2.3. Designated Use Change to Cso Wet Weather Category; Long Term Control Plans

13-18-3-2.4. Review of Feasibility of Implementing Additional or New Control Alternatives to Attain Water Quality Standards

13-18-3-2.5. Cso Wet Weather Limited Use Subcategory Established; Application After Approval of Long Term Control Plan; Other Requirements; Epa Approval; Monitoring and Review; Rules

13-18-3-2.6. Permit Schedules of Compliance

13-18-3-3. Repealed

13-18-3-4. Orders; Review by Environmental Law Judge

13-18-3-5. Additional Duties

13-18-3-6. Enforcement

13-18-3-7. Orders to Acquire, Construct, Repair, Alter, or Extend Plants

13-18-3-8. Sealing of Mines and Wells

13-18-3-9. Entry Upon Property; Purposes

13-18-3-10. Assistance From Other State Departments, Agencies, or Institutions

13-18-3-11. Liberal Construction

13-18-3-12. Adoption of Rules Waiving Requirement of Submission of Plans

13-18-3-13. Violation of Storm Water Runoff Rules

13-18-3-14. Outstanding State Resource Water Improvement Fund; Report

13-18-3-15. Terms and Conditions of Npdes General Permits