Sec. 5. Plans and specifications submitted to the commissioner under section 1 of this chapter shall be approved if it is determined that the plans and specifications meet all of the following conditions:
(1) The plans and specifications are satisfactory with respect to the following:
(A) Sanitary quality, including chlorination, if required.
(B) Chemical quality.
(C) Adequacy of the water supply.
(2) The plans and specifications meet the requirements of any rules or standards adopted by the board under section 8 of this chapter governing the location, design, construction, and operation and maintenance of:
(A) public water system installations; and
(B) changes or additions to public water system installations.
[Pre-1996 Recodification Citation: 13-7-14-2.]
As added by P.L.1-1996, SEC.8. Amended by P.L.184-2002, SEC.15.
Structure Indiana Code
Article 18. Water Pollution Control
Chapter 16. Public Water Supplies
13-18-16-1. Submission of Plans and Specifications; Issuance of Permit; Determination
13-18-16-2. Revocation or Modification of Permit
13-18-16-4. Emergency Repairs or Proceedings
13-18-16-6. Operation and Maintenance; Duties; Violations
13-18-16-7. Water Samples and Reports of Operations
13-18-16-9. Agency to Secure Benefits of Federal Act
13-18-16-10. Continuing Surveillance
13-18-16-11. Local Government Programs and Facilities