Sec. 3. The board shall establish requirements for the issuance of permits to control solid waste, hazardous waste, and atomic radiation, including the following:
(1) Permits to control or limit the disposal of any contaminants onto or into the land.
(2) Permits for the construction, installation, or modification of facilities, equipment, or devices:
(A) to control or limit any discharge, emission, or disposal of contaminants into the land; or
(B) for the storage, treatment, processing, transferring, or disposal of solid waste or hazardous waste.
(3) Permits for the operation of facilities, equipment, or devices:
(A) to control or limit the discharge, emission, transfer, or disposal of any contaminants into the land; or
(B) for the storage, transportation, treatment, processing, transferring, or disposal of solid waste or hazardous waste.
(4) Permits for the disposal of coal combustion residuals in landfills and surface impoundments.
[Pre-1996 Recodification Citation: 13-7-10-1(e).]
As added by P.L.1-1996, SEC.5. Amended by P.L.133-2012, SEC.97; P.L.100-2021, SEC.6.