Sec. 11.6. (a) A discharger is not required to obtain a state permit for the modification or construction of a water pollution treatment or control facility if the discharger has an effective:
(1) National Pollutant Discharge Elimination System (NPDES) industrial permit for direct discharges to surface water; or
(2) industrial waste pretreatment permit not issued by the department for discharges to a publicly owned treatment works.
(b) If a modification is for the treatment or control of any new influent pollutant or increased levels of any existing pollutant, within thirty (30) days after commencement of operation, the discharger shall file with the department a notice of installation for the additional pollutant control equipment and a design summary of any modifications.
(c) The board shall adopt a general permit rule for the approval of sanitary collection system plans, lift station plans, and force main plans.
As added by P.L.72-1999, SEC.2. Amended by P.L.113-2014, SEC.63.
Structure Indiana Code
Article 14. Powers and Duties of Department of Environmental Management and Boards
Chapter 8. Rules and Standards
13-14-8-0.3. Application of Rule That Does Not Comply With Ic 13-20-7-1
13-14-8-1. Adoption or Modification of Rules and Standards
13-14-8-2. Proposal for Adoption or Modification of Rules and Standards
13-14-8-4. Considerations in Adoption
13-14-8-8. Variance From Rules; Application; Hearing; Five Year Limit; Revocation of Variance
13-14-8-10. Undue Hardship; Criteria
13-14-8-11.5. Site-Specific Limitation for Npdes Permit; Application Process and Criteria
13-14-8-11.6. Permits for Modification or Construction of Water Pollution Facility