Illinois Compiled Statutes
20 ILCS 3855/ - Illinois Power Agency Act.
Article 1 - The Illinois Power Agency Act

(20 ILCS 3855/Art. 1 heading)


 
(20 ILCS 3855/1-1)
Sec. 1-1. Short title. This Article may be cited as the Illinois Power Agency Act. References in this Article to "this Act" mean this Article.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-5)
Sec. 1-5. Legislative declarations and findings. The General Assembly finds and declares:
The General Assembly therefore finds that it is necessary to create the Illinois Power Agency and that the goals and objectives of that Agency are to accomplish each of the following:
 
(20 ILCS 3855/1-10)
Sec. 1-10. Definitions.
"Agency" means the Illinois Power Agency.
"Agency loan agreement" means any agreement pursuant to which the Illinois Finance Authority agrees to loan the proceeds of revenue bonds issued with respect to a project to the Agency upon terms providing for loan repayment installments at least sufficient to pay when due all principal of, interest and premium, if any, on those revenue bonds, and providing for maintenance, insurance, and other matters in respect of the project.
"Authority" means the Illinois Finance Authority.
"Brownfield site photovoltaic project" means photovoltaics that are either:
"Clean coal facility" means an electric generating facility that uses primarily coal as a feedstock and that captures and sequesters carbon dioxide emissions at the following levels: at least 50% of the total carbon dioxide emissions that the facility would otherwise emit if, at the time construction commences, the facility is scheduled to commence operation before 2016, at least 70% of the total carbon dioxide emissions that the facility would otherwise emit if, at the time construction commences, the facility is scheduled to commence operation during 2016 or 2017, and at least 90% of the total carbon dioxide emissions that the facility would otherwise emit if, at the time construction commences, the facility is scheduled to commence operation after 2017. The power block of the clean coal facility shall not exceed allowable emission rates for sulfur dioxide, nitrogen oxides, carbon monoxide, particulates and mercury for a natural gas-fired combined-cycle facility the same size as and in the same location as the clean coal facility at the time the clean coal facility obtains an approved air permit. All coal used by a clean coal facility shall have high volatile bituminous rank and greater than 1.7 pounds of sulfur per million btu content, unless the clean coal facility does not use gasification technology and was operating as a conventional coal-fired electric generating facility on June 1, 2009 (the effective date of Public Act 95-1027).
"Clean coal SNG brownfield facility" means a facility that (1) has commenced construction by July 1, 2015 on an urban brownfield site in a municipality with at least 1,000,000 residents; (2) uses a gasification process to produce substitute natural gas; (3) uses coal as at least 50% of the total feedstock over the term of any sourcing agreement with a utility and the remainder of the feedstock may be either petroleum coke or coal, with all such coal having a high bituminous rank and greater than 1.7 pounds of sulfur per million Btu content unless the facility reasonably determines
that it is necessary to use additional petroleum coke to
deliver additional consumer savings, in which case the
facility shall use coal for at least 35% of the total
feedstock over the term of any sourcing agreement; and (4) captures and sequesters at least 85% of the total carbon dioxide emissions that the facility would otherwise emit.
"Clean coal SNG facility" means a facility that uses a gasification process to produce substitute natural gas, that sequesters at least 90% of the total carbon dioxide emissions that the facility would otherwise emit, that uses at least 90% coal as a feedstock, with all such coal having a high bituminous rank and greater than 1.7 pounds of sulfur per million btu content, and that has a valid and effective permit to construct emission sources and air pollution control equipment and approval with respect to the federal regulations for Prevention of Significant Deterioration of Air Quality (PSD) for the plant pursuant to the federal Clean Air Act; provided, however, a clean coal SNG brownfield facility shall not be a clean coal SNG facility.
"Clean energy" means energy generation that is 90% or greater free of carbon dioxide emissions.
"Commission" means the Illinois Commerce Commission.
"Community renewable generation project" means an electric generating facility that:
"Costs incurred in connection with the development and construction of a facility" means:
"Delivery services" has the same definition as found in Section 16-102 of the Public Utilities Act.
"Delivery year" means the consecutive 12-month period beginning June 1 of a given year and ending May 31 of the following year.
"Department" means the Department of Commerce and Economic Opportunity.
"Director" means the Director of the Illinois Power Agency.
"Demand-response" means measures that decrease peak electricity demand or shift demand from peak to off-peak periods.
"Distributed renewable energy generation device" means a device that is:
"Energy efficiency" means measures that reduce the amount of electricity or natural gas consumed in order to achieve a given end use. "Energy efficiency" includes voltage optimization measures that optimize the voltage at points on the electric distribution voltage system and thereby reduce electricity consumption by electric customers' end use devices. "Energy efficiency" also includes measures that reduce the total Btus of electricity, natural gas, and other fuels needed to meet the end use or uses.
"Electric utility" has the same definition as found in Section 16-102 of the Public Utilities Act.
"Equity investment eligible community" or "eligible community" are synonymous and mean the geographic areas throughout Illinois which would most benefit from equitable investments by the State designed to combat discrimination. Specifically, the eligible communities shall be defined as the following areas:
"Equity eligible persons" or "eligible persons" means persons who would most benefit from equitable investments by the State designed to combat discrimination, specifically:
"Equity eligible contractor" means a business that is majority-owned by eligible persons, or a nonprofit or cooperative that is majority-governed by eligible persons, or is a natural person that is an eligible person offering personal services as an independent contractor.
"Facility" means an electric generating unit or a co-generating unit that produces electricity along with related equipment necessary to connect the facility to an electric transmission or distribution system.
"General Contractor" means the entity or organization with main responsibility for the building of a construction project and who is the party signing the prime construction contract for the project.
"Governmental aggregator" means one or more units of local government that individually or collectively procure electricity to serve residential retail electrical loads located within its or their jurisdiction.
"High voltage direct current converter station" means the collection of equipment that converts direct current energy from a high voltage direct current transmission line into alternating current using Voltage Source Conversion technology and that is interconnected with transmission or distribution assets located in Illinois.
"High voltage direct current renewable energy credit" means a renewable energy credit associated with a renewable energy resource where the renewable energy resource has entered into a contract to transmit the energy associated with such renewable energy credit over high voltage direct current transmission facilities.
"High voltage direct current transmission facilities" means the collection of installed equipment that converts alternating current energy in one location to direct current and transmits that direct current energy to a high voltage direct current converter station using Voltage Source Conversion technology. "High voltage direct current transmission facilities" includes the high voltage direct current converter station itself and associated high voltage direct current transmission lines. Notwithstanding the preceding, after the effective date of this amendatory Act of the 102nd General Assembly, an otherwise qualifying collection of equipment does not qualify as high voltage direct current transmission facilities unless its developer entered into a project labor agreement, is capable of transmitting electricity at 525kv with an Illinois converter station located and interconnected in the region of the PJM Interconnection, LLC, and the system does not operate as a public utility, as that term is defined in Section 3-105 of the Public Utilities Act.
"Index price" means the real-time energy settlement price at the applicable Illinois trading hub, such as PJM-NIHUB or MISO-IL, for a given settlement period.
"Indexed renewable energy credit" means a tradable credit that represents the environmental attributes of one megawatt hour of energy produced from a renewable energy resource, the price of which shall be calculated by subtracting the strike price offered by a new utility-scale wind project or a new utility-scale photovoltaic project from the index price in a given settlement period.
"Indexed renewable energy credit counterparty" has the same meaning as "public utility" as defined in Section 3-105 of the Public Utilities Act.
"Local government" means a unit of local government as defined in Section 1 of Article VII of the Illinois Constitution.
"Municipality" means a city, village, or incorporated town.
"Municipal utility" means a public utility owned and operated by any subdivision or municipal corporation of this State.
"Nameplate capacity" means the aggregate inverter nameplate capacity in kilowatts AC.
"Person" means any natural person, firm, partnership, corporation, either domestic or foreign, company, association, limited liability company, joint stock company, or association and includes any trustee, receiver, assignee, or personal representative thereof.
"Project" means the planning, bidding, and construction of a facility.
"Project labor agreement" means a pre-hire collective bargaining agreement that covers all terms and conditions of employment on a specific construction project and must include the following:
A labor organization and the general contractor building the project shall have the authority to include other terms and conditions as they deem necessary.
"Public utility" has the same definition as found in Section 3-105 of the Public Utilities Act.
"Qualified combined heat and power systems" means systems that, either simultaneously or sequentially, produce electricity and useful thermal energy from a single fuel source. Such systems are eligible for "renewable energy credits" in an amount equal to its total energy output where a renewable fuel is consumed or in an amount equal to the net reduction in nonrenewable fuel consumed on a total energy output basis.
"Real property" means any interest in land together with all structures, fixtures, and improvements thereon, including lands under water and riparian rights, any easements, covenants, licenses, leases, rights-of-way, uses, and other interests, together with any liens, judgments, mortgages, or other claims or security interests related to real property.
"Renewable energy credit" means a tradable credit that represents the environmental attributes of one megawatt hour of energy produced from a renewable energy resource.
"Renewable energy resources" includes energy and its associated renewable energy credit or renewable energy credits from wind, solar thermal energy, photovoltaic cells and panels, biodiesel, anaerobic digestion, crops and untreated and unadulterated organic waste biomass, and hydropower that does not involve new construction or significant expansion of hydropower dams, waste heat to power systems, or qualified combined heat and power systems. For purposes of this Act, landfill gas produced in the State is considered a renewable energy resource. "Renewable energy resources" does not include the incineration or burning of tires, garbage, general household, institutional, and commercial waste, industrial lunchroom or office waste, landscape waste, railroad crossties, utility poles, or construction or demolition debris, other than untreated and unadulterated waste wood. "Renewable energy resources" also includes high voltage direct current renewable energy credits and the associated energy converted to alternating current by a high voltage direct current converter station to the extent that: (1) the generator of such renewable energy resource contracted with a third party to transmit the energy over the high voltage direct current transmission facilities, and (2) the third-party contracting for delivery of renewable energy resources over the high voltage direct current transmission facilities have ownership rights over the unretired associated high voltage direct current renewable energy credit.
"Retail customer" has the same definition as found in Section 16-102 of the Public Utilities Act.
"Revenue bond" means any bond, note, or other evidence of indebtedness issued by the Authority, the principal and interest of which is payable solely from revenues or income derived from any project or activity of the Agency.
"Sequester" means permanent storage of carbon dioxide by injecting it into a saline aquifer, a depleted gas reservoir, or an oil reservoir, directly or through an enhanced oil recovery process that may involve intermediate storage, regardless of whether these activities are conducted by a clean coal facility, a clean coal SNG facility, a clean coal SNG brownfield facility, or a party with which a clean coal facility, clean coal SNG facility, or clean coal SNG brownfield facility has contracted for such purposes.
"Service area" has the same definition as found in Section 16-102 of the Public Utilities Act.
"Settlement period" means the period of time utilized by MISO and PJM and their successor organizations as the basis for settlement calculations in the real-time energy market.
"Sourcing agreement" means (i) in the case of an electric utility, an agreement between the owner of a clean coal facility and such electric utility, which agreement shall have terms and conditions meeting the requirements of paragraph (3) of subsection (d) of Section 1-75, (ii) in the case of an alternative retail electric supplier, an agreement between the owner of a clean coal facility and such alternative retail electric supplier, which agreement shall have terms and conditions meeting the requirements of Section 16-115(d)(5) of the Public Utilities Act, and (iii) in case of a gas utility, an agreement between the owner of a clean coal SNG brownfield facility and the gas utility, which agreement shall have the terms and conditions meeting the requirements of subsection (h-1) of Section 9-220 of the Public Utilities Act.
"Strike price" means a contract price for energy and renewable energy credits from a new utility-scale wind project or a new utility-scale photovoltaic project.
"Subscriber" means a person who (i) takes delivery service from an electric utility, and (ii) has a subscription of no less than 200 watts to a community renewable generation project that is located in the electric utility's service area. No subscriber's subscriptions may total more than 40% of the nameplate capacity of an individual community renewable generation project. Entities that are affiliated by virtue of a common parent shall not represent multiple subscriptions that total more than 40% of the nameplate capacity of an individual community renewable generation project.
"Subscription" means an interest in a community renewable generation project expressed in kilowatts, which is sized primarily to offset part or all of the subscriber's electricity usage.
"Substitute natural gas" or "SNG" means a gas manufactured by gasification of hydrocarbon feedstock, which is substantially interchangeable in use and distribution with conventional natural gas.
"Total resource cost test" or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures and including avoided costs associated with reduced use of natural gas or other fuels, avoided costs associated with reduced water consumption, and avoided costs associated with reduced operation and maintenance costs, as well as other quantifiable societal benefits, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases. In discounting future societal costs and benefits for the purpose of calculating net present values, a societal discount rate based on actual, long-term Treasury bond yields should be used. Notwithstanding anything to the contrary, the TRC test shall not include or take into account a calculation of market price suppression effects or demand reduction induced price effects.
"Utility-scale solar project" means an electric generating facility that:
"Utility-scale wind project" means an electric generating facility that:
"Waste Heat to Power Systems" means systems that capture and generate electricity from energy that would otherwise be lost to the atmosphere without the use of additional fuel.
"Zero emission credit" means a tradable credit that represents the environmental attributes of one megawatt hour of energy produced from a zero emission facility.
"Zero emission facility" means a facility that: (1) is fueled by nuclear power; and (2) is interconnected with PJM Interconnection, LLC or the Midcontinent Independent System Operator, Inc., or their successors.
(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-15)
Sec. 1-15. Illinois Power Agency.
(a) For the purpose of effectuating the policy declared in Section 1-5 of this Act, a State agency known as the Illinois Power Agency is created. The Agency shall exercise governmental and public powers, be perpetual in duration, and have the powers and duties enumerated in this Act, together with such others conferred upon it by law.
(b) The Agency is not created or organized, and its operations shall not be conducted, for the purpose of making a profit. No part of the revenues or assets of the Agency shall inure to the benefit of or be distributable to any of its employees or any other private persons, except as provided in this Act for actual services rendered. The Agency shall operate as an independent agency subject to the oversight of the Executive Ethics Commission.

(Source: P.A. 97-618, eff. 10-26-11.)
 
(20 ILCS 3855/1-20)
Sec. 1-20. General powers and duties of the Agency.
(a) The Agency is authorized to do each of the following:
(b) Except as otherwise limited by this Act, the Agency has all of the powers necessary or convenient to carry out the purposes and provisions of this Act, including without limitation, each of the following:
(c) In conducting the procurement of electricity or other products, beginning January 1, 2022, the Agency shall not procure any products or services from persons or organizations that are in violation of the Displaced Energy Workers Bill of Rights, as provided under the Energy Community Reinvestment Act at the time of the procurement event or fail to comply the labor standards established in subparagraph (Q) of paragraph (1) of subsection (c) of Section 1-75.
(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-21)
Sec. 1-21. Eminent domain. The Agency may take and acquire possession by eminent domain of any property or interest in property that the Agency is authorized to acquire under this Act for the construction, maintenance, or operation of a facility with the consent in writing of the Governor, after following the provisions of Section 1-85(a) of this Act, to acquire by private purchase, or by condemnation in the manner provided for the exercise of the power of eminent domain under the Eminent Domain Act. The power of condemnation shall be exercised, however, solely for the purposes of one or more of the following: siting, rights of way, and easements appurtenant. The Agency shall not exercise its powers of condemnation until it has used reasonable good faith efforts to acquire the property before filing a petition for condemnation and may thereafter use those powers when it determines that the condemnation of the property rights is necessary to avoid unreasonable delay or economic hardship to the progress of activities carried out in the exercise of powers granted under this Act. Before use of the power of condemnation for projects, the Agency shall hold a public hearing to receive comments on the exercise of the power of condemnation. The Agency shall use the information received at the hearing in making its final decision on the exercise of the power of condemnation. The hearing shall be held in a location reasonably accessible to the public interested in the decision. The Agency shall promulgate guidelines for the conduct of the hearing. The Agency shall conduct a feasibility study showing that the taking is necessary to accomplish the purposes of this Act and that is adequate to meet the environmental standards set forth by the State and the federal governments. The Agency may not exercise the authority provided in Article 20 of the Eminent Domain Act (quick-take procedure) providing for immediate possession in those proceedings. The Agency does not have the power to exercise eminent domain over the property of any public utility or any person owning an electric generating plant.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-22)
Sec. 1-22. Authority of the Illinois Commerce Commission. Nothing in this Act infringes upon the authority granted to the Commission.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-25)
Sec. 1-25. Agency subject to other laws. Unless otherwise stated, the Agency is subject to the provisions of all applicable laws, including but not limited to, each of the following:
(Source: P.A. 99-906, eff. 6-1-17.)
 
(20 ILCS 3855/1-30.1)
Sec. 1-30.1. Administrative Procedure Act applies. The provisions of the Illinois Administrative Procedure Act are expressly adopted and incorporated into this Act, and apply to all administrative rules and procedures of the Agency.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-30.2)
Sec. 1-30.2. Administrative Review Law applies. Any final administrative decision of the Agency, or of the Director of the Agency, that is not subject to review by the Commission, is subject to review under the provisions of the Administrative Review Law.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-30.3)
Sec. 1-30.3. Illinois State Auditing Act applies. For purposes of the Illinois State Auditing Act, the Agency is a "State agency" within the meaning of the Act and is subject to the jurisdiction of the Auditor General.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-35)
Sec. 1-35. Agency rules. The Agency shall adopt rules as may be necessary and appropriate for the operation of the Agency. In addition to other rules relevant to the operation of the Agency, the Agency shall adopt rules that accomplish each of the following:
The Agency shall not adopt any rules that infringe upon the authority granted to the Commission.

(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-40)
Sec. 1-40. Illinois Power Agency Operations Fund.
(a) The Illinois Power Agency Operations Fund is created as a special fund in the State treasury.
(b) The Illinois Power Agency Operations Fund shall be administered by the Agency for the Agency's operations as specified in this Section.
(c) All moneys used by the Agency from the Illinois Power Agency Operations Fund are subject to appropriation by the General Assembly.
(d) All disbursements from the Illinois Power Agency Operations Fund shall be made only upon warrants of the State Comptroller drawn upon the State Treasurer as custodian of the Fund upon vouchers signed by the Director or by the person or persons designated by the Director for that purpose. The Comptroller is authorized to draw the warrant upon vouchers so signed. The State Treasurer shall accept all warrants so signed and shall be released from liability for all payments made on those warrants.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-45)
Sec. 1-45. Illinois Power Agency Facilities Fund.
(a) The Illinois Power Agency Facilities Fund is created as a special fund in the State treasury.
(b) The Illinois Power Agency Facilities Fund shall be administered by the Agency for costs incurred in connection with the development and construction of a facility by the Agency as well as costs incurred in connection with the operation and maintenance of an Agency facility.
(c) All moneys used by the Agency from the Illinois Power Agency Facilities Fund are subject to appropriation by the General Assembly.
(d) All disbursements from the Illinois Power Agency Facilities Fund shall be made only upon warrants of the State Comptroller drawn upon the State Treasurer as custodian of the Fund upon vouchers signed by the Director or by the person or persons designated by the Director for that purpose. The Comptroller is authorized to draw the warrant upon vouchers so signed. The State Treasurer shall accept all warrants so signed and shall be released from liability for all payments made on those warrants.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-50)
Sec. 1-50. Illinois Power Agency Debt Service Fund.
(a) The Illinois Power Agency Debt Service Fund is created as a special fund in the State treasury.
(b) The Illinois Power Agency Debt Service Fund shall be administered by the Agency for retirement of revenue bonds issued for any Agency facility.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-55)
Sec. 1-55. Operations Funding. The Agency shall adopt rules regarding charges and fees it is expressly authorized to collect in order to fund the operations of the Agency. These charges and fees shall be deposited into the Illinois Power Agency Operations Fund.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-56)
Sec. 1-56. Illinois Power Agency Renewable Energy Resources Fund; Illinois Solar for All Program.
(a) The Illinois Power Agency Renewable Energy Resources Fund is created as a special fund in the State treasury.
(b) The Illinois Power Agency Renewable Energy Resources Fund shall be administered by the Agency as described in this subsection (b), provided that the changes to this subsection (b) made by this amendatory Act of the 99th General Assembly shall not interfere with existing contracts under this Section.
As used in this subsection (b), "low-income households" means persons and families whose income does not exceed 80% of area median income, adjusted for family size and revised every 5 years.
For the purposes of this subsection (b), the Agency shall define "environmental justice community" based on the methodologies and findings established by the Agency and the Administrator for the Illinois Solar for All Program in its initial long-term renewable resources procurement plan and as updated by the Agency and the Administrator for the Illinois Solar for All Program as part of the long-term renewable resources procurement plan update.
(b-5) After the receipt of all payments required by Section 16-115D of the Public Utilities Act, no additional funds shall be deposited into the Illinois Power Agency Renewable Energy Resources Fund unless directed by order of the Commission.
(b-10) After the receipt of all payments required by Section 16-115D of the Public Utilities Act and payment in full of all contracts executed by the Agency under subsections (b) and (i) of this Section, if the balance of the Illinois Power Agency Renewable Energy Resources Fund is under $5,000, then the Fund shall be inoperative and any remaining funds and any funds submitted to the Fund after that date, shall be transferred to the Supplemental Low-Income Energy Assistance Fund for use in the Low-Income Home Energy Assistance Program, as authorized by the Energy Assistance Act.
(c) (Blank).
(d) (Blank).
(e) All renewable energy credits procured using monies from the Illinois Power Agency Renewable Energy Resources Fund shall be permanently retired.
(f) The selection of one or more third-party program managers or administrators, the selection of the independent evaluator, and the procurement processes described in this Section are exempt from the requirements of the Illinois Procurement Code, under Section 20-10 of that Code.
(g) All disbursements from the Illinois Power Agency Renewable Energy Resources Fund shall be made only upon warrants of the Comptroller drawn upon the Treasurer as custodian of the Fund upon vouchers signed by the Director or by the person or persons designated by the Director for that purpose. The Comptroller is authorized to draw the warrant upon vouchers so signed. The Treasurer shall accept all warrants so signed and shall be released from liability for all payments made on those warrants.
(h) The Illinois Power Agency Renewable Energy Resources Fund shall not be subject to sweeps, administrative charges, or chargebacks, including, but not limited to, those authorized under Section 8h of the State Finance Act, that would in any way result in the transfer of any funds from this Fund to any other fund of this State or in having any such funds utilized for any purpose other than the express purposes set forth in this Section.
(h-5) The Agency may assess fees to each bidder to recover the costs incurred in connection with a procurement process held under this Section. Fees collected from bidders shall be deposited into the Renewable Energy Resources Fund.
(i) Supplemental procurement process.
 
(20 ILCS 3855/1-57)
Sec. 1-57. Facility financing.
(a) The Agency shall have the power (1) to borrow from the Authority, through one or more Agency loan agreements, the net proceeds of revenue bonds for costs incurred in connection with the development and construction of a facility, provided that the stated maturity date of any of those revenue bonds shall not exceed 40 years from their respective issuance dates, (2) to accept prepayments from purchasers of electric energy from a project and to apply the same to costs incurred in connection with the development and construction of a facility, subject to any obligation to refund the same under the circumstances specified in the purchasers' contract for the purchase and sale of electric energy from that project, (3) to enter into leases or similar arrangements to finance the property constituting a part of a project and associated costs incurred in connection with the development and construction of a facility, provided that the term of any such lease or similar arrangement shall not exceed 40 years from its inception, and (4) to enter into agreements for the sale of revenue bonds that bear interest at a rate or rates not exceeding the maximum rate permitted by the Bond Authorization Act. All Agency loan agreements shall include terms making the obligations thereunder subject to redemption before maturity.
(b) The Agency may from time to time engage the services of the Authority, attorneys, appraisers, architects, engineers, accountants, credit analysts, bond underwriters, bond trustees, credit enhancement providers, and other financial professionals and consultants, if the Agency deems it advisable.
(c) The Agency may pledge, as security for the payment of its revenue bonds in respect of a project, (1) revenues derived from the operation of the project in part or whole, (2) the real and personal property, machinery, equipment, structures, fixtures, and inventories directly associated with the project, (3) grants or other revenues or taxes expected to be received by the Agency directly linked to the project, (4) payments to be made by another governmental unit or other entity pursuant to a service, user, or other similar agreement with that governmental unit or other entity that is a result of the project, (5) any other revenues or moneys deposited or to be deposited directly linked to the project, (6) all design, engineering, procurement, construction, installation, management, and operation agreements associated with the project, (7) any reserve or debt service funds created under the agreements governing the indebtedness, (8) the Illinois Power Agency Facilities Fund or the Illinois Power Agency Debt Service Fund, or (9) any combination thereof. Any such pledge shall be authorized in a writing, signed by the Director of the Agency, and then signed by the Governor of Illinois. At no time shall the funds contained in the Illinois Power Agency Trust Fund be pledged or used in any way to pay for the indebtedness of the Agency. The Director shall not authorize the issuance or grant of any pledge until he or she has certified that any associated project is in full compliance with Sections 1-85 and 1-86 of this Act. The certification shall be duly attached or referenced in the agreements reflecting the pledge. Any such pledge made by the Agency shall be valid and binding from the time the pledge is made. The revenues, property, or funds that are pledged and thereafter received by the Agency shall immediately be subject to the lien of the pledge without any physical delivery thereof or further act; and, subject only to the provisions of prior liens, the lien of the pledge shall be valid and binding as against all parties having claims of any kind in tort, contract, or otherwise against the Agency irrespective of whether the parties have notice thereof. All bonds issued on behalf of the Agency must be issued by the Authority and must be revenue bonds. These revenue bonds may be taxable or tax-exempt.
(d) All indebtedness issued by or on behalf of the Agency, including, without limitation, any revenue bonds issued by the Authority on behalf of the Agency, shall not be a debt of the State, the Authority, any political subdivision thereof (other than the Agency to the extent provided in agreements governing the indebtedness), any local government, any governmental aggregator as defined in this Act, or any local government, and none of the State, the Authority, any political subdivision thereof (other than the Agency to the extent provided in agreements governing the indebtedness), any local government, or any government aggregator shall be liable thereon. Neither the Authority nor the Agency shall have the power to pledge the credit, the revenues, or the taxing power of the State, any political subdivision thereof (other than the Agency), any governmental aggregator, or of any local government, and neither the credit, the revenues, nor the taxing power of the State, any political subdivision thereof (other than the Agency), any governmental aggregator, or any local government shall be, or shall be deemed to be, pledged to the payment of any revenue bonds, notes, or other obligations of the Agency. In addition, the agreements governing any issue of indebtedness shall provide that all holders of that indebtedness, by virtue of their acquisition thereof, have agreed to waive and release all claims and causes of action against the State of Illinois in respect of the indebtedness or any project associated therewith based on any theory of law. However, the waiver shall not prohibit the holders of indebtedness issued on behalf of the Agency from filing any cause of action against or recovering damages from the Agency, recovering from any property or funds pledged to secure the indebtedness, or recovering from any property or funds to which the Agency holds title, provided the property or funds are directly associated with the project for which the indebtedness was specifically issued. Each evidence of indebtedness of the Agency, including the revenue bonds issued by the Authority on behalf of the Agency, shall contain a clear and explicit statement of the provisions of this Section.
(e) The Agency may from time to time enter into an agreement or agreements to defease indebtedness issued on its behalf or to refund, at maturity, at a redemption date or in advance of either, any indebtedness issued on its behalf or pursuant to redemption provisions or at any time before maturity. All such refunding indebtedness shall be subject to the requirements set forth in subsections (a), (c), and (d) of this Section. No revenue bonds issued to refund or advance refund revenue bonds issued under this Section may mature later than the longest maturity date of the series of bonds being refunded. After the aggregate original principal amount of revenue bonds authorized in this Section has been issued, the payment of any principal amount of those revenue bonds does not authorize the issuance of additional revenue bonds (except refunding revenue bonds).
(f) If the Agency fails to pay the principal of, interest, or premium, if any, on any indebtedness as the same becomes due, a civil action to compel payment may be instituted in the appropriate circuit court by the holder or holders of the indebtedness on which the default of payment exists or by any administrative agent, collateral agent, or indenture trustee acting on behalf of those holders. Delivery of a summons and a copy of the complaint to the Director of the Agency shall constitute sufficient service to give the circuit court jurisdiction over the subject matter of the suit and jurisdiction over the Agency and its officers named as defendants for the purpose of compelling that payment. Any case, controversy, or cause of action concerning the validity of this Act shall relate to the revenue of the Agency. Any such claims and related proceedings are subject in all respects to the provisions of subsection (d) of this Section. The State of Illinois shall not be liable or in any other way financially responsible for any indebtedness issued by or on behalf of the Agency or the performance or non-performance of any covenants associated with any such indebtedness. The foregoing statement shall not prohibit the holders of any indebtedness issued on behalf of the Agency from filing any cause of action against or recovering damages from the Agency recovering from any property pledged to secure that indebtedness or recovering from any property or funds to which the Agency holds title provided such property or funds are directly associated with the project for which the indebtedness is specifically issued.
(g) Upon each delivery of the revenue bonds authorized to be issued by the Authority under this Act, the Agency shall compute and certify to the State Comptroller the total amount of principal of and interest on the Agency loan agreement supporting the revenue bonds issued that will be payable in order to retire those revenue bonds and the amount of principal of and interest on the Agency loan agreement that will be payable on each payment date during the then current and each succeeding fiscal year. As soon as possible after the first day of each month, beginning on the date set forth in the Agency loan agreement where that date specifies when the Agency shall begin setting aside revenues and other moneys for repayment of the revenue bonds per the agreed to schedule, the Agency shall certify to the Comptroller and the Comptroller shall order transferred and the Treasurer shall transfer from the Illinois Power Agency Facilities Fund to the Illinois Power Agency Debt Service Fund for each month remaining in the State fiscal year a sum of money, appropriated for that purpose, equal to the result of the amount of principal of and interest on those revenue bonds payable on the next payment date divided by the number of full calendar months between the date of those revenue bonds, and the first such payment date, and thereafter divided by the number of months between each succeeding payment date after the first. The Comptroller is authorized and directed to draw warrants on the State Treasurer from the Illinois Power Agency Facilities Fund and the Illinois Power Agency Debt Service Fund for the amount of all payments of principal and interest on the Agency loan agreement relating to the Authority revenue bonds issued under this Act. The State Treasurer or the State Comptroller shall deposit or cause to be deposited any amount of grants or other revenues expected to be received by the Agency that the Agency has pledged to the payment of revenue bonds directly into the Illinois Power Agency Debt Service Fund.

(Source: P.A. 98-756, eff. 7-16-14.)
 
(20 ILCS 3855/1-58)
Sec. 1-58. Clean coal SNG facility construction.
(a) It is the intention of the General Assembly to provide additional long-term natural gas price stability to the State and consumers by promoting the development of a clean coal SNG facility that would produce a minimum annual output of 30 Bcf of SNG and commence construction no later than June 1, 2013 on a brownfield site in a municipality with at least one million residents. The costs associated with preparing a facility cost report for such a facility, which contains all of the information required by subsection (b) of this Section, may be paid or reimbursed pursuant to subsection (c) of this Section.
(b) The facility cost report for a facility that meets the criteria set forth in subsection (a) of this Section shall be prepared by a duly licensed engineering firm that details the estimated capital costs payable to one or more contractors or suppliers for the engineering, procurement, and construction of the components comprising the facility and the estimated costs of operation and maintenance of the facility. The report must be provided to the General Assembly and the Agency on or before April 30, 2010. The facility cost report shall include all off the following:
(c) Reasonable amounts paid or due to be paid by the owner or owners of the clean coal SNG facility to third parties unrelated to the owner or owners to prepare the facility cost report will be reimbursed or paid up to $10 million through Coal Development Bonds.
(d) The Agency shall review the facility report and based on that report, consider whether to enter into long term contracts to purchase SNG from the facility pursuant to Section 1-20 of this Act. To assist with its evaluation of the report, the Agency may hire one or more experts or consultants, the reasonable costs of which, not to exceed $250,000, shall be paid for by the owner or owners of the clean coal SNG facility submitting the facility cost report. The Agency may begin the process of selecting such experts or consultants prior to receipt of the facility cost report.

(Source: P.A. 96-781, eff. 8-28-09; 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10.)
 
(20 ILCS 3855/1-60)
Sec. 1-60. Moneys made available by private or public entities. The Agency may apply for, receive, expend, allocate, or disburse funds and moneys made available by public or private entities, including, but not limited to, contracts, private or public financial gifts, bequests, grants, or donations from individuals, corporations, foundations, or public or private institutions of higher learning. All funds received by the Agency from these sources shall be deposited:
Any funds received, expended, allocated, or disbursed shall be expended by the Agency for the purposes as indicated by the grantor, donor, or, in the case of funds or moneys given or donated for no specific purposes, for any purpose deemed appropriate by the Director in administering the responsibilities of the Agency as set forth in this Act.

(Source: P.A. 100-863, eff. 8-14-18.)
 
(20 ILCS 3855/1-65)
Sec. 1-65. Appropriations for operations. The General Assembly may appropriate moneys from the General Revenue Fund for the operation of the Illinois Power Agency in Fiscal Year 2008 not to exceed $1,250,000 and in Fiscal Year 2009 not to exceed $1,500,000. These appropriated funds shall constitute an advance that the Agency shall repay without interest to the State in Fiscal Year 2010 and in Fiscal Year 2011. Beginning with Fiscal Year 2010, the operation of the Agency shall be funded solely from moneys in the Illinois Power Agency Operations Fund with no liability or obligation imposed on the State by those operations.

(Source: P.A. 95-481, eff. 8-28-07; 95-876, eff. 8-21-08.)
 
(20 ILCS 3855/1-70)
Sec. 1-70. Agency officials.
(a) The Agency shall have a Director who meets the qualifications specified in Section 5-222 of the Civil Administrative Code of Illinois.
(b) Within the Illinois Power Agency, the Agency shall establish a Planning and Procurement Bureau and may establish a Resource Development Bureau. Each Bureau shall report to the Director.
(c) The Chief of the Planning and Procurement Bureau shall be appointed by the Director, at the Director's sole discretion, and (i) shall have at least 5 years of direct experience in electricity supply planning and procurement and (ii) shall also hold an advanced degree in risk management, law, business, or a related field.
(d) The Chief of the Resource Development Bureau may be appointed by the Director and (i) shall have at least 5 years of direct experience in electric generating project development and (ii) shall also hold an advanced degree in economics, engineering, law, business, or a related field.
(e) Notwithstanding any other provision of law, for terms beginning on or after January 16, 2023, the Director shall receive an annual salary of $165,000. On July 1, 2023, and on each July 1 thereafter, the Director shall receive an increase in salary based on a cost of living adjustment as authorized by Senate Joint Resolution 192 of the 86th General Assembly. No annual salary for the Director or a Bureau Chief shall exceed the amount of salary set by law for the Governor that is in effect on July 1 of that fiscal year.
(f) The Director and each Bureau Chief shall not, for 2 years prior to appointment or for 2 years after he or she leaves his or her position, be employed by an electric utility, independent power producer, power marketer, or alternative retail electric supplier regulated by the Commission or the Federal Energy Regulatory Commission.
(g) The Director and Bureau Chiefs are prohibited from: (i) owning, directly or indirectly, 5% or more of the voting capital stock of an electric utility, independent power producer, power marketer, or alternative retail electric supplier; (ii) being in any chain of successive ownership of 5% or more of the voting capital stock of any electric utility, independent power producer, power marketer, or alternative retail electric supplier; (iii) receiving any form of compensation, fee, payment, or other consideration from an electric utility, independent power producer, power marketer, or alternative retail electric supplier, including legal fees, consulting fees, bonuses, or other sums. These limitations do not apply to any compensation received pursuant to a defined benefit plan or other form of deferred compensation, provided that the individual has otherwise severed all ties to the utility, power producer, power marketer, or alternative retail electric supplier.

(Source: P.A. 102-662, eff. 9-15-21; 102-1115, eff. 1-9-23.)
 
(20 ILCS 3855/1-75)
Sec. 1-75. Planning and Procurement Bureau. The Planning and Procurement Bureau has the following duties and responsibilities:
(a) The Planning and Procurement Bureau shall each year, beginning in 2008, develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois. Beginning with the delivery year commencing on June 1, 2017, the Planning and Procurement Bureau shall develop plans and processes for the procurement of zero emission credits from zero emission facilities in accordance with the requirements of subsection (d-5) of this Section. Beginning on the effective date of this amendatory Act of the 102nd General Assembly, the Planning and Procurement Bureau shall develop plans and processes for the procurement of carbon mitigation credits from carbon-free energy resources in accordance with the requirements of subsection (d-10) of this Section. The Planning and Procurement Bureau shall also develop procurement plans and conduct competitive procurement processes in accordance with the requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load. This Section shall not apply to a small multi-jurisdictional utility until such time as a small multi-jurisdictional utility requests the Agency to prepare a procurement plan for their Illinois jurisdictional load. For the purposes of this Section, the term "eligible retail customers" has the same definition as found in Section 16-111.5(a) of the Public Utilities Act.
Beginning with the plan or plans to be implemented in the 2017 delivery year, the Agency shall no longer include the procurement of renewable energy resources in the annual procurement plans required by this subsection (a), except as provided in subsection (q) of Section 16-111.5 of the Public Utilities Act, and shall instead develop a long-term renewable resources procurement plan in accordance with subsection (c) of this Section and Section 16-111.5 of the Public Utilities Act.
In accordance with subsection (c-5) of this Section, the Planning and Procurement Bureau shall oversee the procurement by electric utilities that served more than 300,000 retail customers in this State as of January 1, 2019 of renewable energy credits from new utility-scale solar projects to be installed, along with energy storage facilities, at or adjacent to the sites of electric generating facilities that, as of January 1, 2016, burned coal as their primary fuel source.
(b) The experts or expert consulting firms retained by the Agency shall, as appropriate, prepare procurement plans, and conduct a competitive procurement process as prescribed in Section 16-111.5 of the Public Utilities Act, to ensure adequate, reliable, affordable, efficient, and environmentally sustainable electric service at the lowest total cost over time, taking into account any benefits of price stability, for eligible retail customers of electric utilities that on December 31, 2005 provided electric service to at least 100,000 customers in the State of Illinois, and for eligible Illinois retail customers of small multi-jurisdictional electric utilities that (i) on December 31, 2005 served less than 100,000 customers in Illinois and (ii) request a procurement plan for their Illinois jurisdictional load.
(c) Renewable portfolio standard.
(c-5) Procurement of renewable energy credits from new renewable energy facilities installed at or adjacent to the sites of electric generating facilities that burn or burned coal as their primary fuel source.
(c-10) Equity accountability system. It is the purpose of this subsection (c-10) to create an equity accountability system, which includes the minimum equity standards for all renewable energy procurements, the equity category of the Adjustable Block Program, and the equity prioritization for noncompetitive procurements, that is successful in advancing priority access to the clean energy economy for businesses and workers from communities that have been excluded from economic opportunities in the energy sector, have been subject to disproportionate levels of pollution, and have disproportionately experienced negative public health outcomes. Further, it is the purpose of this subsection to ensure that this equity accountability system is successful in advancing equity across Illinois by providing access to the clean energy economy for businesses and workers from communities that have been historically excluded from economic opportunities in the energy sector, have been subject to disproportionate levels of pollution, and have disproportionately experienced negative public health outcomes.
(c-15) Racial discrimination elimination powers and process.
(c-20) Program data collection.
(c-25) Energy Workforce Equity Database.
(c-30) Enforcement of minimum equity standards. All entities seeking renewable energy credits must submit an annual report to demonstrate compliance with each of the equity commitments required under subsection (c-10). If the Agency concludes the entity has not met or maintained its minimum equity standards required under the applicable subparagraphs under subsection (c-10), the Agency shall deny the entity's ability to participate in procurement programs in subsection (c), including by withholding approved vendor or designee status. The Agency may require the entity to enter into a corrective action plan. An entity that is not recertified for failing to meet required equity actions in subparagraph (c-10) may reapply once they have a corrective action plan and achieve compliance with the minimum equity standards.
(d) Clean coal portfolio standard.
credits that it receives in connection with the electricity covered by such
(d-5) Zero emission standard.
(d-10) Nuclear Plant Assistance; carbon mitigation credits.
(1) The General Assembly finds:
(2) As used in this subsection:
"Baseline costs" means costs used to establish a customer protection cap that have been evaluated through an independent audit of a carbon-free energy resource conducted by the Environmental Protection Agency that evaluated projected annual costs for operation and maintenance expenses; fully allocated overhead costs, which shall be allocated using the methodology developed by the Institute for Nuclear Power Operations; fuel expenditures; nonfuel capital expenditures; spent fuel expenditures; a return on working capital; the cost of operational and market risks that could be avoided by ceasing operation; and any other costs necessary for continued operations, provided that "necessary" means, for purposes of this definition, that the costs could reasonably be avoided only by ceasing operations of the carbon-free energy resource.
"Carbon mitigation credit" means a tradable credit that represents the carbon emission reduction attributes of one megawatt-hour of energy produced from a carbon-free energy resource.
"Carbon-free energy resource" means a generation facility that: (1) is fueled by nuclear power; and (2) is interconnected to PJM Interconnection, LLC.
(3) Procurement.
(e) The draft procurement plans are subject to public comment, as required by Section 16-111.5 of the Public Utilities Act.
(f) The Agency shall submit the final procurement plan to the Commission. The Agency shall revise a procurement plan if the Commission determines that it does not meet the standards set forth in Section 16-111.5 of the Public Utilities Act.
(g) The Agency shall assess fees to each affected utility to recover the costs incurred in preparation of the annual procurement plan for the utility.
(h) The Agency shall assess fees to each bidder to recover the costs incurred in connection with a competitive procurement process.
(i) A renewable energy credit, carbon emission credit, zero emission credit, or carbon mitigation credit can only be used once to comply with a single portfolio or other standard as set forth in subsection (c), subsection (d), or subsection (d-5) of this Section, respectively. A renewable energy credit, carbon emission credit, zero emission credit, or carbon mitigation credit cannot be used to satisfy the requirements of more than one standard. If more than one type of credit is issued for the same megawatt hour of energy, only one credit can be used to satisfy the requirements of a single standard. After such use, the credit must be retired together with any other credits issued for the same megawatt hour of energy.
(Source: P.A. 101-81, eff. 7-12-19; 101-113, eff. 1-1-20; 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-77)
Sec. 1-77. The Planning and Procurement Bureau; feedstock procurement administrator; qualified expert or expert consulting firm.
(a) The Planning and Procurement Bureau shall at least every 5
years beginning in 2015 develop feedstock procurement plans and conduct competitive feedstock procurement processes in accordance with the requirements of Section 1-78 of this Act.
(b) The experts or expert consulting firms retained
by the Agency shall, as appropriate, prepare feedstock procurement plans and conduct a competitive feedstock procurement process as prescribed in Section 1-78 of this Act to ensure adequate, reliable, affordable feedstocks, taking into account any benefits of price stability, for the clean coal SNG brownfield facility.
(c) The draft procurement plans are subject to public comment pursuant to Section 1-78 of this Act.
(d) The Agency shall assess fees to each bidder to recover the costs incurred in connection with the competitive procurement process.

(Source: P.A. 97-96, eff. 7-13-11.)
 
(20 ILCS 3855/1-78)
Sec. 1-78. Feedstock procurement plan; feedstock procurement process.
(a) A feedstock procurement plan shall at least every 5 years beginning in 2015 be prepared for the clean coal SNG brownfield facility based on the clean coal SNG brownfield facility's projection of feedstock usage and ratios, and consistent with the applicable requirements of the Public Utilities Act and this Act. The plan shall specifically identify the wholesale feedstock products to be procured following plan approval and shall follow all the requirements set forth in this Act, the Public Utilities Act, and all applicable State and federal laws, statutes, rules, or regulations, as well as Commission orders. Nothing in this Section precludes consideration of contracts longer than 5 years and related forecast data. Any feedstock procurement occurring in accordance with this plan shall be competitively bid through a request for proposals process. Approval and implementation of the feedstock procurement plan shall be subject to review and approval by the Commission according to the provisions set forth in this Section. A feedstock procurement plan shall include each of the following components:
(b) The feedstock procurement process shall be administered by a feedstock procurement administrator and monitored by a feedstock procurement monitor.
(c) The feedstock planning process shall be conducted as follows:
(d) The feedstock procurement process shall include each of the following components:
The feedstock procurement process described in this
subsection (d) is exempt from the requirements of the Illinois Procurement Code, pursuant to Section 20-10 of that Code.
(e) Within 2 business days after opening the sealed bids, the feedstock procurement administrator shall submit a confidential report to the Commission. The report shall contain the results of the bidding for each of the feedstock types along with the feedstock procurement administrator's recommendation for the acceptance and rejection of bids based on the price benchmark criteria and other factors observed in the process. The feedstock procurement monitor also shall submit a confidential report to the Commission within 2 business days after opening the sealed bids. The report shall contain the feedstock procurement monitor's assessment of bidder behavior in the process, as well as an assessment of the feedstock procurement administrator's compliance with the feedstock procurement process and rules. The Commission shall review the confidential reports submitted by the feedstock procurement administrator and feedstock procurement monitor and shall accept or reject the recommendations of the feedstock procurement administrator within 2 business days after receipt of the reports.
(f) Within 3 business days after the Commission decision approving the results of a feedstock procurement event, the clean coal SNG brownfield facility shall enter into binding contractual arrangements with the winning suppliers using standard form contracts.
(g) The names of the successful bidders and the amount of feedstock to be delivered for each contract type and for each contract term shall be made available to the public at the time of Commission approval of a feedstock procurement event. The Commission, the procurement monitor, the feedstock procurement administrator, the Agency, and all participants in the feedstock procurement process shall maintain the confidentiality of all other supplier and bidding information in a manner consistent with all applicable laws, rules, regulations, and tariffs. Confidential information, including the confidential reports submitted by the feedstock procurement administrator and feedstock procurement monitor pursuant to subsection (e) of this Section, shall not be publicly available or discoverable by any party in any proceeding absent a compelling demonstration of need. The reports shall not be admissible in any proceeding other than one for law enforcement purposes.
(h) Within 2 business days after a Commission decision approving the results of a feedstock procurement event or such other date as may be required by the Commission from time to time, the clean coal SNG brownfield facility shall file for informational purposes with the Commission its actual or estimated feedstock costs by utility customer reflecting the costs associated with the feedstock procurement.
(i) The clean coal SNG brownfield facility shall pay for reasonable costs incurred by the Agency in administering the feedstock procurement events, which costs shall be included in the actual delivered fuel costs of the clean coal SNG brownfield facility. The Agency shall determine the amount owed for each feedstock procurement event, and the clean coal SNG brownfield facility shall pay that amount to the Agency within 30 days after being informed by the Agency of the amount owed. Those funds shall be deposited into the Illinois Power Agency Operations Fund, pursuant to Section 1-55 of this Act, to be used to reimburse expenses related to the feedstock procurement.
(j) The Commission has the authority to adopt rules to carry out the provisions of this Section. For the public interest, safety, and welfare, the Commission also has the authority to adopt rules to carry out the provisions of this Section on an emergency basis.
(k) On or before April 1 of each year, the Commission may hold an informal hearing for the purpose of receiving comments on the prior year's feedstock procurement process and any recommendations for change.

(Source: P.A. 97-96, eff. 7-13-11.)
 
(20 ILCS 3855/1-80)
Sec. 1-80. Resource Development Bureau. Upon its establishment by the Agency, the Resource Development Bureau has the following duties and responsibilities:
(e) Electric utilities shall not be required to purchase electricity directly or indirectly from facilities developed or sponsored by the Agency.
(f) The Agency may sell excess capacity and excess energy into the wholesale electric market at prevailing market rates; provided, however, the Agency may not sell excess capacity or excess energy through the procurement process described in Section 16-111.5 of the Public Utilities Act.
(g) The Agency shall not directly sell electric power and energy to retail customers. Nothing in this paragraph shall be construed to prohibit sales to municipal electric systems, governmental aggregators, or rural electric cooperatives.

(Source: P.A. 99-536, eff. 7-8-16.)
 
(20 ILCS 3855/1-85)
Sec. 1-85. Construction of facilities. The Agency may begin construction of a facility costing the Agency more than $100,000,000 only if the Agency demonstrates each of the following:
(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-86)
Sec. 1-86. General Assembly approval. For projects costing the Agency $1,000,000,000 or more, in addition to the provisions of Section 1-85, the General Assembly must adopt a joint resolution of the House of Representatives and the Senate approving the construction of the facility.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-87)
Sec. 1-87. Management and operating agreements. For projects costing the Agency $1,000,000,000 or more, the Agency shall enter into management and operating agreements for the relevant facility or facilities. Solicitation for any such management and operating agreement shall be pursuant to a request for proposals. The agreements must comply with the Internal Revenue Code and its regulations and shall not jeopardize the tax-exempt status of any bond issued in connection with a project for which the Agency entered into the agreement.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-90)
Sec. 1-90. Distribution and transmission facilities. The Agency shall not own or acquire distribution or transmission facilities except as necessary to connect an Agency facility to an electric transmission or distribution system.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-92)
Sec. 1-92. Aggregation of electrical load by municipalities, townships, and counties.
(a) The corporate authorities of a municipality, township board, or county board of a county
may
adopt an ordinance under which it may aggregate in accordance with this
Section residential and small commercial retail electrical loads located, respectively, within the
municipality, the township, or the unincorporated areas of the county and, for that purpose, may solicit bids and enter into service
agreements to facilitate
for those
loads the sale and purchase of electricity and related services and equipment.
The corporate authorities, township board, or county
board may also exercise such authority jointly with any other municipality, township, or county.
Two or
more
municipalities, townships, or counties, or a combination of both, may initiate a
process
jointly to authorize aggregation by a majority vote of each particular
municipality, township, or
county as required by this Section.
If the corporate authorities, township board, or the county board seek to operate the aggregation program as an opt-out program for residential and small commercial retail customers, then prior to the adoption of an ordinance with respect to aggregation of residential and small commercial retail electric loads, the corporate authorities of a municipality, the township board, or the county board of a county shall submit a referendum to its residents to determine whether or not the aggregation program shall operate as an opt-out program for residential and small commercial retail customers. Any county board that seeks to submit such a referendum to its residents shall do so only in unincorporated areas of the county where no electric aggregation ordinance has been adopted.
In addition to the notice and conduct requirements of the general election law, notice of the referendum shall state briefly the purpose of the referendum. The question of whether the corporate authorities, the township board, or the county board shall adopt an opt-out aggregation program for residential and small commercial retail customers shall be submitted to the electors of the municipality, township board, or county board at a regular election and approved by a majority of the electors voting on the question. The corporate authorities, township board, or county board must certify to the proper election authority, which must submit the question at an election in accordance with the Election Code.
The election authority must submit the question in substantially the following form:
If a majority of the electors voting on the question vote in the affirmative, then the corporate authorities, township board, or county board may implement an opt-out aggregation program for residential and small commercial retail customers.
A referendum must pass in each particular municipality, township, or county that is engaged in the aggregation program. If the referendum fails, then the corporate authorities, township board, or county board shall operate the aggregation program as an opt-in program for residential and small commercial retail customers.
An
ordinance under this Section shall specify whether the aggregation will occur
only with
the prior consent of each person owning, occupying, controlling, or using an
electric load
center proposed to be aggregated. Nothing in this Section,
however,
authorizes the aggregation of electric loads that are served or authorized to be served by an electric cooperative as defined by and pursuant to the Electric Supplier Act or loads served by a municipality that owns and operates its own electric distribution system. No
aggregation shall take
effect unless
approved by a majority of the members of the corporate authority, township board, or county board voting upon the ordinance.
A governmental aggregator under this Section is not a public utility or an
alternative retail electric supplier.
For purposes of this Section, "township" means the portion of a township that is an unincorporated portion of a county that is not otherwise a part of a municipality. In addition to such other limitations as are included in this Section, a township board shall only have authority to aggregate residential and small commercial customer loads in accordance with this Section if the county board of the county in which the township is located (i) is not also submitting a referendum to its residents at the same general election that the township board proposes to submit a referendum under this subsection (a), (ii) has not received authorization through passage of a referendum to operate an opt-out aggregation program for residential and small commercial retail customers under this subsection (a), and (iii) has not otherwise enacted an ordinance under this subsection (a) authorizing the operation of an opt-in aggregation program for residential and small commercial retail customers as described in this Section.
(b) Upon the applicable requisite authority under this Section, the corporate
authorities, the township board, or the county board, with assistance from the Illinois Power Agency, shall develop a plan of operation and
governance for the
aggregation program so authorized. Before adopting a plan under this Section,
the
corporate authorities, township board, or county board shall hold at least 2 public hearings on
the plan.
Before the first hearing, the corporate authorities, township board, or county board shall
publish notice of
the hearings once a week for 2 consecutive weeks in a newspaper of general
circulation
in the jurisdiction. The notice shall summarize the plan and state the date,
time, and
location of each hearing.
Any load aggregation plan established pursuant to this Section shall:
(c) The process for soliciting bids for electricity and other related services and awarding proposed agreements for the purchase of electricity and other related services shall be conducted in the following order:
Any corporate authority, township board, or county board receiving customer information from an electric utility shall be subject to the limitations on the disclosure of the information described in Section 16-122 of the Public Utilities Act and Section 2HH of the Consumer Fraud and Deceptive Business Practices Act, and an electric utility shall not be held liable for any claims arising out of the provision of information pursuant to this item (2).
(d) If the corporate authorities, township board, or county board operate under an opt-in program for residential and small commercial retail customers, then the corporate authorities, township board, or county board shall comply with all of the following:
(e) If the corporate authorities, township board, or county board operate as an opt-out program for residential and small commercial retail customers, then it shall be the duty of the aggregated entity to fully inform
residential and small commercial retail customers in advance that they have the right to opt out of the aggregation program.
The disclosure shall prominently state all charges to be made and
shall include
full disclosure of the cost to obtain service pursuant to Section 16-103 of the Public Utilities Act, how
to access it,
and the fact that it is available to them without penalty, if they are
currently receiving
service under that Section. The Illinois Power Agency shall furnish, without charge, to
any citizen a
list of all supply options available to them in a format that
allows
comparison of prices and products.
(f) Any person or entity retained by a municipality or county, or jointly by more than one such unit of local government, to provide input, guidance, or advice in the selection of an electricity supplier for an aggregation program shall disclose in writing to the involved units of local government the nature of any relationship through which the person or entity may receive, either directly or indirectly, commissions or other remuneration as a result of the selection of any particular electricity supplier. The written disclosure must be made prior to formal approval by the involved units of local government of any professional services agreement with the person or entity, or no later than October 1, 2012 with respect to any such professional services agreement entered into prior to the effective date of this amendatory Act of the 97th General Assembly. The disclosure shall cover all direct and indirect relationships through which commissions or remuneration may result, including the pooling of commissions or remuneration among multiple persons or entities, and shall identify all involved electricity suppliers. The disclosure requirements in this subsection (f) are to be liberally construed to ensure that the nature of financial interests are fully revealed, and these disclosure requirements shall apply regardless of whether the involved person or entity is licensed under Section 16-115C of the Public Utilities Act. Any person or entity that fails to make the disclosure required under this subsection (f) is liable to the involved units of local government in an amount equal to all compensation paid to such person or entity by the units of local government for the input, guidance, or advice in the selection of an electricity supplier, plus reasonable attorneys fees and court costs incurred by the units of local government in connection with obtaining such amount.
(g) The Illinois Power Agency shall provide assistance to municipalities, townships, counties, or associations working with municipalities to help complete the plan and bidding process.
(h) This Section does not prohibit municipalities or counties from entering into an intergovernmental agreement to aggregate residential and small commercial retail electric loads.
(i) No later than June 1, 2023, the Illinois Power Agency shall produce a report assessing how aggregation of electrical load by municipalities, townships, and counties can be used to help meet the renewable energy goals outlined in this Act. This report shall contain, at a minimum, an assessment of other states' utilization of load aggregation in meeting renewable energy goals, any known or expected barriers in utilizing load aggregation for meeting renewable energy goals, and recommendations for possible changes in State law necessary for electrical load aggregation to be a driver of new renewable energy project development. This report shall be published on the Agency's website and delivered to the Governor and General Assembly. To assist with developing this report, the Agency may retain the services of its expert consulting firm used to develop its procurement plans as provided in paragraph (1) of subsection (a) of Section 1-75.
(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-95)
Sec. 1-95. Insurance. Upon the Authority's issuance of revenue bonds for an Agency facility, the Agency shall purchase an insurance policy to cover those construction and operation costs associated with the facility. The policy shall remain in effect for the time period under which the Agency may accrue any liabilities associated with the facility.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-100)
Sec. 1-100. Timely payment to Agency. Any party receiving electricity shall make timely payment on all bills rendered by the Agency. Any violation of contractual terms by a party receiving electricity from an Agency facility is grounds for cancellation and termination of the contract.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-105)
Sec. 1-105. Deposit of revenue. All revenue from contracts described in Section 1-80(d) shall be deposited into the Illinois Power Agency Facilities Fund.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-110)
Sec. 1-110. State Police reimbursement. The Agency shall reimburse the Illinois State Police for any expenses associated with security at facilities from the Illinois Power Agency Facilities Fund.

(Source: P.A. 102-538, eff. 8-20-21.)
 
(20 ILCS 3855/1-115)
Sec. 1-115. Revenue from real estate. All revenue from any sale, conveyance, lease, exchange, transfer, abandonment, or other disposition of real property shall be deposited into the Illinois Power Agency Facilities Fund.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-120)
Sec. 1-120. Protection of confidential and proprietary information. The Agency shall provide adequate protection for confidential and proprietary information furnished, delivered, or filed by any person, corporation, or other entity.

(Source: P.A. 95-481, eff. 8-28-07.)
 
(20 ILCS 3855/1-125)
Sec. 1-125. Agency annual reports.
(a) By February 15 of each year, the Agency shall report annually to the Governor and the General Assembly on the operations and transactions of the Agency. The annual report shall include, but not be limited to, each of the following:
(b) In addition to reporting on the transactions and operations of the Agency, the Agency shall also endeavor to
report on the following items through its annual report, recognizing that full and accurate information may not be available for certain items:
The Agency may seek assistance from the Illinois Commerce
Commission in developing its annual report and may also retain
the services of its expert consulting firm used to develop its
procurement plans as outlined in paragraph (1) of subsection
(a) of Section 1-75. Confidential or commercially sensitive
business information provided by retail customers, alternative
retail electric suppliers, or other parties shall be kept
confidential by the Agency consistent with Section 1-120, but
may be publicly reported in aggregate form.
(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-127)
Sec. 1-127. Minority owned businesses, female owned businesses, and businesses owned by persons with disabilities; reports.
(a) The Director of the Illinois Power Agency, or his or her designee, when offering bids for professional services, shall conduct outreach to minority owned businesses, female owned businesses, and businesses owned by persons with disabilities. Outreach shall include, but is not limited to, advertisements in periodicals and newspapers, mailings, and other appropriate media.
(b) The Director or his or her designee shall, upon request, provide technical assistance to minority owned businesses, female owned businesses, and businesses owned by persons with disabilities seeking to do business with the Agency.
(c) The Director or his or her designee, upon request, shall conduct post-bid reviews with minority owned businesses, female owned businesses, and businesses owned by persons with disabilities whose bids were not selected by the Agency. Post-bid reviews shall provide a business with detailed and specific reasons why the bid of that business was rejected and concrete recommendations to improve its bid application on future Agency professional services opportunities.
(d) The Agency shall report annually to the Governor and the General Assembly by July 1. The report shall identify the businesses that have provided bids to offer professional services to the Agency and shall also include, but not be limited to, the following information:
(e) In this Section, "professional services" means services that use skills that are predominantly mental or intellectual, rather than physical or manual, including, but not limited to, accounting, architecture, consulting, engineering, finance, legal, and marketing. "Professional services" does not include bidders into the competitive procurement process pursuant to Section 16-111.5 of the Public Utilities Act.

(Source: P.A. 99-143, eff. 7-27-15.)
 
(20 ILCS 3855/1-128)
Sec. 1-128. Nonprofit Electric Generation Task Force.
(a) By January 1, 2028, the Nonprofit Electric Generation Task Force shall be established to assess the technological, economic, and regulatory feasibility as well as legislative support mechanisms necessary to achieve the carbon emission reduction targets described in Section 9.15 of the Environmental Protection Act through the use of carbon capture, sequestration, and utilization technology.
(b) The Task Force shall consist of the following members:
(c) The Task Force shall have the following duties:
(d) The Task Force may hire an independent third-party auditor with relevant financial expertise to conduct a financial audit of the Prairie State Generating Company, including an examination of potential financial solutions to alleviate the existing indirect debt obligations facing the joint indirect Prairie State Generating Company owners in Illinois. The audit shall include a review of the existing debt structure for the Prairie State Generating Company and the individual finances of each joint direct company owner in Illinois in order to recommend an appropriate and equitable method for allocating any funds, whether from the State or federal government, or any other legal source, that may be provided to support the joint indirect owners in Illinois. Any commercially sensitive information reviewed pursuant to this audit shall be reasonably redacted from the Task Force's final report and shall not be subject to disclosure under the Freedom of Information Act.

(Source: P.A. 102-662, eff. 9-15-21.)
 
(20 ILCS 3855/1-130)
(Section scheduled to be repealed on January 1, 2024)
Sec. 1-130. Home rule preemption.
(a) The authorization to impose any new taxes or fees specifically related to the generation of electricity by, the capacity to generate electricity by, or the emissions into the atmosphere by electric generating facilities after the effective date of this Act is an exclusive power and function of the State. A home rule unit may not levy any new taxes or fees specifically related to the generation of electricity by, the capacity to generate electricity by, or the emissions into the atmosphere by electric generating facilities after the effective date of this Act. This Section is a denial and limitation on home rule powers and functions under subsection (g) of Section 6 of Article VII of the Illinois Constitution.
(b) This Section is repealed on January 1, 2024.

(Source: P.A. 101-639, eff. 6-12-20; 102-671, eff. 11-30-21; 102-1109, eff. 12-21-22.)