25-4009. COMPLIANCE SCHEDULES AND MONITORING. (1) Compliance schedule. The director may establish a compliance schedule for facilities as part of the permit conditions including:
(a) Specific steps or actions to be taken by the permittee to achieve compliance with applicable requirements or permit conditions; and
(b) Dates by which those steps or actions are to be taken.
(2) Monitoring requirements. Any facility may be subject to monitoring requirements including, but not limited to, the following:
(a) The type, installation, use and maintenance of monitoring equipment;
(b) Monitoring or sampling methodology, frequency and locations;
(c) Monitored substances or parameters;
(d) Testing and analytical procedures; and
(e) Reporting requirements including both frequency and form.
History:
[25-4009, added 2011, ch. 227, sec. 1, p. 618.]
Structure Idaho Code
Chapter 40 - POULTRY ENVIRONMENTAL ACT
Section 25-4001 - SHORT TITLE.
Section 25-4002 - DEFINITIONS.
Section 25-4003 - PERMIT REQUIRED.
Section 25-4004 - PERMIT APPLICATION.
Section 25-4005 - EXISTING FACILITIES.
Section 25-4006 - DESIGN AND CONSTRUCTION.
Section 25-4007 - NUTRIENT MANAGEMENT PLANS.
Section 25-4008 - INSPECTIONS.
Section 25-4009 - COMPLIANCE SCHEDULES AND MONITORING.
Section 25-4010 - FEES AND ASSESSMENTS TO BE COLLECTED.
Section 25-4011 - DESIGNATION.
Section 25-4012 - AUTHORITY TO PROMULGATE RULES.
Section 25-4014 - PENALTY FOR VIOLATIONS.
Section 25-4015 - DECLARATION OF POLICY AND STATEMENT OF LEGISLATIVE INTENT.