Connecticut General Statutes
Chapter 173 - Public School Building Projects
Section 10-286. - Computation of school building project grants.

(a) The amount of the grant approved by the Commissioner of Administrative Services under the provisions of this chapter for any completed school building project shall be computed as follows:

(1) For the fiscal year ending June 30, 2012, and each fiscal year thereafter, in the case of a new school plant, an extension of an existing school building or projects involving the major alteration of any existing building to be used for school purposes, the eligible percentage, as determined in section 10-285a, of the result of multiplying together the number representing the highest projected enrollment, based on data acceptable to the Commissioner of Administrative Services, for such building during the eight-year period from the date a local or regional board of education files a notification of a proposed school building project with the Department of Administrative Services, the number of gross square feet per pupil determined by the Commissioner of Administrative Services to be adequate for the kind of educational program or programs intended, and the eligible cost of such project, divided by the gross square feet of such building, or the eligible percentage, as determined in section 10-285a, of the eligible cost of such project, whichever is less;
(2) In the case of projects involving the purchase of an existing building to be used for school purposes, the eligible percentage, as determined in section 10-285a, of the eligible cost as determined by the Commissioner of Administrative Services, provided any project involving the purchase and renovation of an existing facility, may be exempt from the standard space specifications, and otherwise ineligible repairs and replacements may be considered eligible for reimbursement as part of such a project, if information is provided acceptable to the Commissioner of Administrative Services documenting the need for such work and the cost savings to the state and the school district of such purchase and renovation project in comparison to alternative construction options;
(3) If any school building project described in subdivisions (1) and (2) of this subsection includes the construction, extension or major alteration of outdoor athletic facilities, tennis courts or a natatorium, gymnasium or auditorium, the grant for the construction of such outdoor athletic facilities, tennis courts and natatorium shall be limited to one-half of the eligible percentage for subdivisions (1) and (2) of the net eligible cost of construction thereof; the grant for the construction of an area of spectator seating in a gymnasium shall be one-half of the eligible percentage for subdivisions (1) and (2) of the net eligible cost of construction thereof; and the grant for the construction of the seating area in an auditorium shall be limited to one-half of the eligible percentage for subdivisions (1) and (2) of the net eligible cost of construction of the portion of such area that seats one-half of the projected enrollment of the building, as defined in subdivision (1) of this subsection, which it serves;
(4) In the case of a regional agricultural science and technology education center or the purchase of equipment pursuant to subsection (a) of section 10-65 or a regional special education facility pursuant to section 10-76e, an amount equal to eighty per cent of the eligible cost of such project, as determined by the Commissioner of Administrative Services;
(5) In the case of a public school administrative or service facility, one-half of the eligible percentage for subdivisions (1) and (2) of this subsection of the eligible project cost as determined by the Commissioner of Administrative Services, or in the case of a regional educational service center administrative or service facility, the eligible percentage, as determined pursuant to subsection (c) of section 10-285a, of the eligible project cost as determined by the commissioner;
(6) In the case of the total replacement of a roof or the total replacement of a portion of a roof which has existed for at least twenty years, or in the case of the total replacement of a roof or the total replacement of a portion of a roof which has existed for fewer than twenty years when it is determined by a registered architect or registered engineer that such roof was improperly designed or improperly constructed and the town is prohibited from recovery of damages or has no other recourse at law or in equity, the eligible percentage for subdivisions (1) and (2) of this subsection, of the eligible cost as determined by the Commissioner of Administrative Services. In the case of the total replacement of a roof or the total replacement of a portion of a roof which has existed for fewer than twenty years (A) when it is determined by a registered architect or registered engineer that such roof was improperly designed or improperly constructed and the town has recourse at law or in equity and recovers less than such eligible cost, the eligible percentage for subdivisions (1) and (2) of this subsection of the difference between such recovery and such eligible cost, and (B) when the roof is at least fifteen years old but less than twenty years old and it cannot be determined by a registered architect or registered engineer that such roof was improperly designed or improperly constructed, the eligible percentage for subdivisions (1) and (2) of this subsection of the eligible project costs provided such costs are multiplied by the ratio of the age of the roof to twenty years. For purposes of this subparagraph, the age of the roof shall be determined in whole years to the nearest year based on the time between the completed installation of the old roof and the date of the grant application for the school construction project for the new roof;
(7) In the case of projects to correct code violations, the eligible percentage, as determined in section 10-285a, of the eligible cost as determined by the Commissioner of Administrative Services;
(8) In the case of a renovation project, the eligible percentage as determined in subsection (b) of section 10-285a, multiplied by the eligible costs as determined by the Commissioner of Administrative Services, provided the project may be exempt from the standard space specifications, and otherwise ineligible repairs and replacements may be considered eligible for reimbursement as part of such a project, if information is provided acceptable to the Commissioner of Administrative Services documenting the need for such work and the cost savings to the state and the school district of such renovation project in comparison to alternative construction options;
(9) In the case of projects approved to remedy certified school indoor air quality emergencies, the eligible percentage, as determined in section 10-285a, of the eligible cost as determined by the Commissioner of Administrative Services;
(10) In the case of a project involving a turn-key purchase for a facility to be used for school purposes, the eligible percentage, as determined in section 10-285a, of the net eligible cost as determined by the Commissioner of Administrative Services, except that for any project involving such a purchase for which an application is made on or after July 1, 2011, (A) final plans for all construction work included in the turn-key purchase agreement shall be approved by the Commissioner of Administrative Services in accordance with section 10-292, and (B) such project may be exempt from the standard space specifications, and otherwise ineligible repairs and replacements may be considered eligible for reimbursement as part of such project, if information acceptable to the Commissioner of Administrative Services documents the need for such work and that such a purchase will cost less than constructing the facility in a different manner and will result in a facility taking on a useful life comparable to that of a new facility.
(b) (1) In the case of all grants computed under this section for a project which constitutes a replacement, extension or major alteration of a damaged or destroyed facility, no grant may be paid if a local or regional board of education has failed to insure its facilities and capital equipment in accordance with the provisions of section 10-220. The amount of financial loss due to any damage or destruction to any such facility, as determined by ascertaining the replacement value of such damage or destruction, shall be deducted from project cost estimates prior to computation of the grant.
(2) In the case of any grants computed under this section for a school building project authorized pursuant to section 10-283 after July 1, 1979, any federal funds or other state funds received for such school building project shall be deducted from project costs prior to computation of the grant.
(3) The calculation of grants pursuant to this section shall be made in accordance with the state standard space specifications in effect at the time of the final grant calculation, except that on and after July 1, 2005, in the case of a school district with an enrollment of less than one hundred fifty students in grades kindergarten to grade eight, inclusive, state standard space specifications shall not apply in the calculation of grants pursuant to this section and the Commissioner of Administrative Services, in consultation with the Commissioner of Education, may modify the standard space specifications for a project in such district.
(c) In the computation of grants pursuant to this section for any school building project authorized by the General Assembly pursuant to section 10-283 (1) after January 1, 1993, any maximum square footage per pupil limit established pursuant to this chapter or any regulation adopted by the State Board of Education or the Department of Administrative Services pursuant to this chapter shall be increased by twenty-five per cent for a building constructed prior to 1959; (2) after January 1, 2004, any maximum square footage per pupil limit established pursuant to this chapter or any regulation adopted by the Department of Administrative Services pursuant to this chapter shall be increased by up to one per cent to accommodate a heating, ventilation or air conditioning system, if needed; (3) for the period from July 1, 2006, to June 30, 2009, inclusive, for projects with total authorized project costs greater than ten million dollars, if total construction change orders or other change directives otherwise eligible for grant assistance under this chapter exceed five per cent of the authorized total project cost, only fifty per cent of the amount of such change order or other change directives in excess of five per cent shall be eligible for grant assistance; and (4) after July 1, 2009, for projects with total authorized project costs greater than ten million dollars, if total construction change orders or other change directives otherwise eligible for grant assistance exceed five per cent of the total authorized project cost, such change order or other change directives in excess of five per cent shall be ineligible for grant assistance.
(d) For any school building project receiving state grant assistance under this chapter, all change orders or other change directives issued for such project (1) on or after July 1, 2008, until June 30, 2011, shall be submitted, not later than six months after the date of such issuance, to the Commissioner of Education, and (2) on or after July 1, 2011, shall be submitted, not later than six months after the date of such issuance, to the Commissioner of Administrative Services, in a manner prescribed by the Commissioner of Administrative Services. Only change orders or other change directives submitted to the Commissioner of Education or Commissioner of Administrative Services, as applicable, in accordance with this subsection shall be eligible for state grant assistance.
(November, 1949, 1953, S. 983d; 1957, P.A. 593, S. 5; March, 1958, P.A. 7, S. 1; 1959, P.A. 321, S. 3; February, 1965, P.A. 361, S. 12; 1967, P.A. 588, S. 2; 1969, P.A. 751, S. 8; P.A. 74-344, S. 2, 3; P.A. 75-298, S. 1, 2; P.A. 76-418, S. 5, 18; P.A. 78-218, S. 193; 78-352, S. 2; P.A. 79-322, S. 1, 2; P.A. 84-3, S. 1, 3; 84-460, S. 9, 16; P.A. 85-358, S. 20, 21; 85-476, S. 5, 6; 85-599, S. 3, 6; P.A. 86-245, S. 1, 2; P.A. 87-305, S. 1, 3; 87-419, S. 2, 3; 87-499, S. 22, 34; P.A. 88-360, S. 31, 63; P.A. 89-355, S. 2, 20; P.A. 91-303, S. 20, 22; P.A. 93-190, S. 1, 2; P.A. 96-244, S. 28, 29, 63; 96-270, S. 6, 7, 11; P.A. 97-265, S. 78, 98; P.A. 00-220, S. 33, 43; P.A. 01-173, S. 27, 67; P.A. 03-76, S. 28; 03-220, S. 5, 8; June Sp. Sess. P.A. 05-6, S. 21; P.A. 06-158, S. 8; P.A. 08-152, S. 14; 08-169, S. 2; 08-170, S. 31; Sept. Sp. Sess. P.A. 09-6, S. 3; P.A. 11-51, S. 123; P.A. 12-120, S. 16; P.A. 13-247, S. 200; P.A. 14-90, S. 10, 11; P.A. 22-118, S. 371.)
History: 1959 act added Subdiv. (g); 1965 act increased dollar amounts in Subdiv. (a) from $500 to $700, in Subdiv. (b) from $700 to $1,100, in Subdiv. (c) from $500 to $700 for elementary pupils and from $700 to $1,100 for secondary pupils and increased percentage in Subdiv. (f) from 15% to 25%; 1967 act increased amounts in Subdiv. (a) to $900 plus $200 per pupil station provided by specialized facilities, in Subdiv. (b) to $1,400, in Subdiv. (c) to $900 for each elementary pupil plus $200 for each elementary pupil station provided by specialized facilities and to $1,400 for each secondary pupil, in Subdiv. (d) from one-third to one-half the cost, replaced former Subdiv. (e) re extensions (now included in Subdiv. (d) with allowance for 70% of cost of building project in secondary school regional district, re placed former Subdiv. (f) re 25% increase in all grants to regional districts with allowance for 80% of cost in building project for regional school district with grades K-12, added exception in Subdiv. (g), and added Subdiv. (h) re occupational training centers; 1969 act included in Subdiv. (d) projects involving site improvements or purchase of existing building and added Subdiv. (i) re administrative and service facilities; P.A. 74-344 made Subdiv. (a) applicable to any new school plant and rewrote provisions, deleted Subdivs. (b) to (d), relettering remaining subdivs. accordingly and added new Subdiv. (h) re leases involving former private schools; P.A. 75-298 substituted “fifty per cent” for “one-half” and “gross” for “average” in Subdiv. (a) and changed applicable dates and changed computation method in Subdivs. (c) and (d); P.A. 76-418 added provisions re athletic facilities, tennis courts, natatoria, etc. in Subdiv. (e) and provisions re deduction of appraised value of damaged and destroyed facilities and re applicability of limitations on construction of athletic facilities, etc.; P.A. 78-218 deleted Subsec. (f) re occupational training centers; P.A. 78-352 changed percentages in Subdivs. (a) and (b) to “not less than forty nor more eighty per cent”, in Subdivs. (c) and (d) to “the percentage as determined in Subsec. (b) of Sec. 10-285a, plus an additional five per cent, but in no case in excess of eighty-five per cent” except with regard to athletic facilities, etc. which all became eligible for grants of “one-half of the eligible percentage for subsections (a) to (d), inclusive”; P.A. 79-322 included in Subdiv. (a) extensions or major alterations of existing buildings and allowed deduction of federal funds received from project cost estimates; P.A. 84-3 clarified that the number of pupils to be counted when computing the grant was to be the number of pupils representing the highest projected enrollment during the 5-year period from the date a school board files a notification of a proposed school building project rather than the number of pupils the plant was designed to accommodate, but provided that the reimbursement for any project on which construction or payments had been started or final grant calculation had been made after June 30, 1975, but prior to July 31, 1983, was to be based on data representing the number of pupils the plant was designed to accommodate; P.A. 84-460 divided section into Subsecs. replacing existing alphabetic Subdiv. indicators with numeric indicators; changed the time period for calculating the highest projected enrollment from 5 to 8 years, in renumbered Subsec. (a)(5) and (6) added provision re regional special education facility and provision re eligible percentage, added new Subsec. (a)(7) and (8) re grant calculation for total or partial replacement of a roof and re grant calculation for projects to correct code violations and (a)(10) re grant calculation for a regional educational service center; in Subsec. (b), inserted Subdiv. indicators and added provision in Subdiv. (1) re nonpayment of grant for failure to insure facilities and capital equipment; P.A. 85-358 added Subsec. (b)(4) re school construction projects authorized during the fiscal year ending June 30, 1985, and thereafter; P.A. 85-476, in conjunction with P.A. 85-599, deleted Subsec. (a)(10) re calculation of percentage for regional educational service centers; P.A. 85-599 also amended Subsec. (a)(6) to add provision re regional educational service center administrative or service facilities, specified applicability of Subdiv. (8) to FY 1983-1984 and thereafter and deleted provision in Subdiv. (9) which limited its applicability to projects involving lease of existing building which had been used as a private school; P.A. 86-245 added Subpara. designations in Subsec. (a)(1) and the reimbursement formula for projects for which estimated grant payments were begun prior to July 31, 1983; P.A. 87-305 in Subsec. (a)(7) reduced, from 25 to 20 years, the age of a roof for which a grant is available without a finding of improper design or construction, provided for the total replacement of a portion of such a roof and for a grant for a roof which has existed for fewer than 20 years when the town recovers less than the eligible cost and made technical changes; P.A. 87-419 replaced provisions re lease of existing buildings by towns or regional school districts based on appraised value in Subsec. (a)(9) with provisions re lease of facilities by regional educational service centers; P.A. 87-499 amended Subsec. (a)(6) to substitute “commissioner” for “state board” and “eligible project cost” for “net eligible project cost”; P.A. 88-360 in Subsec. (a) substituted “commissioner” for “state board” of education and in Subdiv. (5) provided an alternate calculation for projects solely for the purchase of equipment for a regional vocational agriculture center; P.A. 89-355 in Subsec. (a) substituted the “eligible percentage” for “not less than forty nor more than eighty per cent” and made technical changes; P.A. 91-303 in Subsec. (a)(9) changed requirements for applications filed on and after July 1, 1991, added provisions concerning the local fire marshal, eligible costs, payment schedule and underpayments and overpayments and removed requirement for inspection by the department of education; P.A. 93-190 added Subsec. (c) re computation of grants for projects authorized after January 1, 1993, for buildings constructed prior to 1950, effective July 1, 1993; P.A. 96-244 amended Subsec. (a) to remove Subdivs. (3) and (4) containing provisions dealing with regional school districts which are covered by Sec. 10-285a, renumbering remaining Subdivs. as necessary, to make technical changes, and in Subdiv. (4) to apply to purchase of equipment and amended Subsec. (b)(2) to add “state funds” and to substitute “costs” for “cost estimates”, effective July 1, 1996; P.A. 96-270 added Subsec. (a)(10), codified as Subdiv. (9) due to other amendments to this section, re renovation projects for which an application is made on or after July 1, 1995, and amended Subsec. (a)(2) to add provision concerning exemption from space specifications and eligibility for reimbursement of otherwise ineligible repairs and replacements for projects for which an application is made on or after July 1, 1995, effective July 1, 1996; P.A. 97-265 deleted Subsec. (a)(8) re leasing of facility by a regional educational service center and redesignated former Subdiv. (9) as Subdiv. (8), effective July 1, 1997; P.A. 00-220 amended Subsec. (a)(6) to make existing provision re improper design or improper construction Subpara. (A) and to add Subpara. (B) re treatment of certain roofs at least 15 years old but less than 20 years old, effective July 1, 2000; P.A. 01-173 amended Subsec. (c) to add exception for applications to the department by June 30, 2002, for use of increased percentage for a building constructed prior to July 1, 1951, effective July 1, 2001; P.A. 03-76 made technical changes in Subsec. (a)(1), effective June 3, 2003; P.A. 03-220 added Subsec. (a)(9) re remediation of certified school indoor air quality emergencies and added Subsec. (d) re square footage per pupil increase for accommodation of heating, ventilation or air conditioning system, effective July 1, 2003; June Sp. Sess. P.A. 05-6 amended Subsec. (b)(4) by adding exception to state standard space specifications for districts enrolling fewer than 150 students in grades kindergarten to eight, effective July 1, 2005; P.A. 06-158 added Subsec. (a)(10) re turn-key purchases, amended Subsec. (c) by designating existing language re buildings constructed prior to 1950 as Subdiv. (1) and by removing exception for buildings constructed prior to July 1, 1951, redesignated existing Subsec. (d) as Subsec. (c)(2), making a conforming change therein, and added Subsec. (c)(3) re change orders, effective July 1, 2006; P.A. 08-152 and 08-170 amended Subsec. (a)(4) to change “vocational agriculture” to “agricultural science and technology education”, effective July 1, 2008; P.A. 08-169 added Subsec. (d) re change orders or other change directives, effective July 1, 2008; Sept. Sp. Sess. P.A. 09-6 amended Subsec. (c) to add Subdiv. (4) re change orders or other change directives after July 1, 2009, and make conforming changes, effective October 5, 2009; P.A. 11-51 amended Subsec. (a) by replacing Commissioner of Education with Commissioner of Construction Services re approval of grant amount, amended Subsec. (a)(1) by replacing “1984” with “2012”, replacing Department of Education with Department of Construction Services re filing notification of proposed school building project and deleting former Subparas. (A) to (D), amended Subsec. (a)(2) by replacing Commissioner of Education with Commissioner of Construction Services and deleting provision re application made on or after July 1, 1995, amended Subsec. (a)(4) to (6) by replacing Commissioner of Education with Commissioner of Construction Services, amended Subsec. (a)(7) by deleting provision re fiscal year ending June 30, 1984, and each fiscal year thereafter and replacing Commissioner of Education with Commissioner of Construction Services, amended Subsec. (a)(8) by deleting provision re application made on or after July 1, 1995, and replacing Commissioner of Education with Commissioner of Construction Services, amended Subsec. (a)(9) by replacing Commissioner of Education with Commissioner of Construction Services, amended Subsec. (a)(10) by replacing Commissioner of Education with Commissioner of Construction Services and “2006” with “2011”, amended Subsec. (b) by deleting former Subdiv. (3) re limitation on grants, redesignating existing Subdiv. (4) as Subdiv. (3) and amending same by deleting language re projects authorized during fiscal year ending June 30, 1985, and projects authorized thereafter and replacing “Commissioner of Education” with “Commissioner of Construction Services, in consultation with the Commissioner of Education”, amended Subsec. (c) by replacing State Board of Education with Department of Construction Services, and amended Subsec. (d) by replacing Commissioner of Education with Commissioner of Construction Services re manner of change order submission, replacing “commissioner” with “Commissioner of Education or Commissioner of Construction Services, as applicable,” re submitted change orders eligible for grant assistance, designating existing language re change orders submitted to Commissioner of Education as Subdiv. (1) and adding “until June 30, 2011,” therein, and adding Subdiv. (2) re change orders submitted to Commissioner of Construction Services on or after July 1, 2011, effective July 1, 2011; P.A. 12-120 amended Subsec. (a)(4) by adding “eighty per cent of” re eligible cost, effective June 15, 2012; pursuant to P.A. 13-247, “Commissioner of Construction Services” and “Department of Construction Services” were changed editorially by the Revisors to “Commissioner of Administrative Services” and “Department of Administrative Services”, respectively, effective July 1, 2013; P.A. 14-90 amended Subsec. (a)(1) by replacing references to Commissioner of Education with references to Commissioner of Administrative Services, and amended Subsec. (c)(1) by adding “or the Department of Administrative Services”, effective July 1, 2014; P.A. 22-118 amended Subsec. (c) by replacing “1950” with “1959”, effective July 1, 2022.
See Sec. 10-42 re computation of expenses of temporary regional school study committee.
See Sec. 10-285a re grants for school building projects.
Violates Art. I, Sec. 20 and Art. VIII, Sec. 1 of Connecticut Constitution. 31 CS 377.

Structure Connecticut General Statutes

Connecticut General Statutes

Title 10 - Education and Culture

Chapter 173 - Public School Building Projects

Section 10-282. - Definitions.

Section 10-283. - Applications for grants for school building projects.

Section 10-283a. - Committee from General Assembly to review listing of eligible projects.

Section 10-283b. - School building projects for the Technical Education and Career System.

Section 10-283c. - Consolidated school construction grant application for multiple projects in a distressed municipality.

Section 10-283d. - Federal funds as part of local share for projects in a priority school district.

Section 10-284. - Approval or disapproval of applications by Commissioner of Administrative Services.

Section 10-285. - Acceptance or rejection of allotment.

Section 10-285a. - Percentage determination for school building project grants.

Section 10-285b. - School building project grants to incorporated or endowed high schools and academies.

Section 10-285c. - Title reversion to the state.

Section 10-285d. - Projects related to full-day kindergarten programs or reduction in class size.

Section 10-285e. - Reimbursement for lease costs. Renovation project requirements.

Section 10-285f. - Design-build projects: Pilot program.

Section 10-285g. - Acoustical standards. Waiver.

Section 10-285h. - Projects for charter schools: Pilot program.

Section 10-286. - Computation of school building project grants.

Section 10-286a. - Grants for occupational training facilities.

Section 10-286b. - Adjustment of grants approved prior to July 1, 1967. Formula for regional school districts.

Section 10-286c. - Establishment of criteria for building grants.

Section 10-286d. - Site-acquisition grant.

Section 10-286e. - Audits.

Section 10-286f. - Professional or consulting fees. No increase due to increased prices for construction materials.

Section 10-286g. - Waiver of audit deficiencies.

Section 10-286h. - School building project grants for diversity schools.

Section 10-287. - Installment payments of school building project grants. Construction contracts subject to bid. Construction management services. Withholding of state grant payments; conditions. Submission of final grant application.

Section 10-287a. - Lump sum payments. Advance payment of grants. Overpayment.

Section 10-287b. - Loans for school building projects. Terms of bonds and notes evidencing such loans.

Section 10-287c. - Regulations.

Section 10-287d. - Bond issue for school building project grants.

Section 10-287e. - School Building Construction Fund.

Section 10-287f. - Renewal of temporary notes outstanding.

Section 10-287g and 10-287h. - Interest subsidy on bonds issued after July 1, 1971. Site acquisition, dates and amounts of project cost and interest grant payments.

Section 10-287i. - Progress payments of state share of eligible project costs. Withholding of grant for failure to comply with minority business enterprise requirements. Withholding of grant pending completion of audit.

Section 10-287j. - Bond issue for funding interest subsidy grants.

Section 10-288. - Grants and loans to towns unable to complete projects.

Section 10-288a. - Replacement or relocation of secondary school associated with center.

Section 10-289. - Issuance of bonds for school building project.

Section 10-289a. - Short-term financing for school building projects.

Section 10-289d. - Definitions.

Section 10-289e. - Private academy project proposal, public hearing, referendum vote.

Section 10-289f. - Loans. Bond issues. Guaranties.

Section 10-289g. - Defaults in payment. Withholding of state aid.

Section 10-289h. - Central kitchen facility projects.

Section 10-290. - Advisory school planning service.

Section 10-290a. - Advisory services re school plant planning.

Section 10-290b. - Publication and distribution of information.

Section 10-290c. - Advisory committee.

Section 10-290d. - Conveyance of air space over schools.

Section 10-290e. - Services agreements. Requirements. Prohibitions.

Section 10-290f. - Standard school construction contracts. Guidance for projects.

Section 10-291. - Approval of plans and site. Expense limit.

Section 10-291a. - Code compliance improvements not required in certain situations.

Section 10-292. - Review of final plans by Commissioner of Administrative Services. Exceptions; role of local officials.

Section 10-292a and 10-292b. - Abatement of asbestos hazards; inspections; regulations. Asbestos abatement plans; reports by school districts.

Section 10-292c. - Definitions.

Section 10-292d. - Interest subsidy grants.

Section 10-292e. - Committee from General Assembly to review listing of eligible interest subsidy grants.

Section 10-292f. - Approval or disapproval of interest subsidy applications by Commissioner of Education.

Section 10-292g. - Percentage determination for interest subsidy grants.

Section 10-292h. - Interest subsidy grants to incorporated or endowed high schools and academies.

Section 10-292i. - Computation of interest subsidy grants.

Section 10-292j. - Installment payment of interest subsidy grants. Withholding of state grant payments.

Section 10-292k. - Bond issue for interest subsidy grants.

Section 10-292l. - Certification of dates and amounts of interest subsidy grant payments.

Section 10-292m. - Short-term financing and interest subsidy grants. Availability of interest subsidy grants for the local share of the cost of school building projects; amount of grant.

Section 10-292n. - Default by municipality or private academy.

Section 10-292o. - Leasing of facilities by regional educational service centers; grants.

Section 10-292p. - School-based health clinic. Entrance requirement.

Section 10-292q. - School Building Projects Advisory Council.

Section 10-292r. - School safety infrastructure criteria.

Section 10-292s. - School building project safety assessment.

Section 10-292t. - Standard checklist for school building projects.

Section 10-292u. - School building project clearinghouse.

Section 10-292v. - School building committees to include member with construction industry experience.