A. The following standards shall apply to the use and development of wetlands and shall be considered in the determination of whether any permit required by this chapter should be granted or denied:
1. Wetlands of primary ecological significance shall not be altered so that the ecological systems in the wetlands are unreasonably disturbed; and
2. Development in Tidewater Virginia, to the maximum extent practical, shall be concentrated in wetlands of lesser ecological significance, in vegetated wetlands which have been irreversibly disturbed before July 1, 1972, in nonvegetated wetlands which have been irreversibly disturbed prior to January 1, 1983, and in areas of Tidewater Virginia outside of wetlands.
B. The provisions of guidelines and minimum standards promulgated by the Commission pursuant to § 28.2-1301 shall be considered in applying the standards listed in subsection A of this section.
C. When any activity authorized by a permit issued pursuant to this chapter is conditioned upon compensatory mitigation for adverse impacts to wetlands, the applicant may be permitted to satisfy all or part of such mitigation requirements by the purchase or use of credits from any wetlands mitigation bank, including any banks owned by the permit applicant, that has been approved and is operating in accordance with applicable federal and state guidance, laws, or regulations for the establishment, use and operation of mitigation banks as long as (i) the bank is in the same fourth order subbasin, as defined by the hydrologic unit boundaries of the National Watershed Boundary Dataset or by the hydrologic unit system or dataset utilized and depicted or described in the bank's approved mitigation banking instrument, as the impacted site, or in an adjacent subbasin within the same river watershed, as the impacted site, or it meets all the conditions found in clauses (a) through (d) and either clause (e) or (f) of this subsection; (ii) the bank is ecologically preferable to practicable on-site and off-site individual mitigation options, as defined by federal wetland regulations; and (iii) the banking instrument, if approved after July 1, 1996, has been approved by a process that included public review and comment. When the bank is not located in the same subbasin or adjacent subbasin within the same river watershed as the impacted site, the purchase or use of credits shall not be allowed unless the applicant demonstrates to the satisfaction of the Commission that (a) the impacts will occur as a result of a Virginia Department of Transportation linear project or as the result of a locality project for a locality whose jurisdiction encompasses multiple river watersheds; (b) there is no practical same river watershed mitigation alternative; (c) the impacts are less than one acre in a single and complete project within a subbasin; (d) there is no significant harm to water quality or fish and wildlife resources within the river watershed of the impacted site; and either (e) impacts within the Chesapeake Bay watershed are mitigated within the Chesapeake Bay watershed as close as possible to the impacted site or (f) impacts within subbasins 02080108, 02080208, and 03010205, as defined by the National Watershed Boundary Dataset, are mitigated in-kind within those subbasins as close as possible to the impacted site. After July 1, 2002, the provisions of clause (f) shall apply only to impacts within subdivisions of the listed subbasins where overlapping watersheds exist, as determined by the Department of Environmental Quality, provided the Department has made such a determination by that date. For the purposes of this subsection, the hydrologic unit boundaries of the National Watershed Boundary Dataset or other hydrologic unit system may be adjusted by the Department of Environmental Quality to reflect site-specific geographic or hydrologic information provided by the bank sponsor.
D. Where an agreed-upon permit condition requires the contribution of in-lieu fees to offset permitted wetland losses, the wetlands board shall credit the applicant for any in-lieu fee payments made to the Virginia Aquatic Resources Trust Fund or another dedicated wetlands restoration fund with reference to the same activity.
For the purposes of this section, "river watershed" means the Potomac River Basin, Shenandoah River Basin, James River Basin, Rappahannock River Basin, Roanoke and Yadkin Rivers Basin, Chowan River Basin (including the Dismal Swamp and Albemarle Sound), Tennessee River Basin, Big Sandy River Basin, Chesapeake Bay and its Small Coastal Basins, Atlantic Ocean, York River Basin, and the New River Basin.
1972, c. 711, § 62.1-13.3; 1982, c. 300; 1992, c. 836; 1996, c. 736; 1999, c. 8; 2011, c. 253; 2014, cc. 131, 332; 2020, c. 809.
Structure Code of Virginia
Title 28.2 - Fisheries and Habitat of the Tidal Waters
§ 28.2-1301. Powers and duties of the Commission
§ 28.2-1302. Adoption of wetlands zoning ordinance; terms of ordinance
§ 28.2-1304. Officers, meetings, rules, etc., of wetlands boards; records and reports
§ 28.2-1305. Local governing body to supply meeting space and services for wetlands board
§ 28.2-1306. Permits required for certain activities; issuance of permits by Commission
§ 28.2-1307. Expedited permits; administrative procedures
§ 28.2-1308. Standards for use and development of wetlands; utilization of guidelines
§ 28.2-1310. Commissioner to review all decisions of wetlands boards
§ 28.2-1311. When Commission to review decision of wetlands board
§ 28.2-1312. Procedure for review; notice of decision
§ 28.2-1313. When Commission to modify, remand, or reverse decision of wetlands board
§ 28.2-1314. Time for issuance of permit
§ 28.2-1316. Investigations and prosecutions
§ 28.2-1317. Monitoring, inspections, compliance, and restoration