(a) The vegetation to be pruned or removed is hanging over electric facilities or growing in such close proximity to overhead electric facilities that the vegetation constitutes an electrical hazard under any electrical safety code adopted by the Public Utility Commission or constitutes a danger under state or federal health and safety codes to a person working on the facilities or with access to the facilities.
(b) The vegetation to be removed is diseased, dead or dying or is close enough to electric facilities that pruning or removal of the vegetation is necessary to avoid contact between the vegetation and electric facilities. A determination under this paragraph must be made by a qualified forester or arborist if a local ordinance or resolution requires that such determinations be made by a qualified forester or arborist.
(c) The vegetation is of such size, condition and proximity to electric facilities that the vegetation can reasonably be expected to cause damage to electric facilities in the future. A determination under this paragraph must be made by a qualified forester or arborist if a local ordinance or resolution requires that such determinations be made by a qualified forester or arborist.
(2) The limitation on liability provided by this section does not apply unless the electric utility has provided notice to owners of the property where the vegetation is located. Notice may be provided by posting a flyer in a conspicuous location on the property where the vegetation is located. The flyer must:
(a) Indicate that the electric utility intends to prune or remove vegetation on the property;
(b) Include a brief statement of the nature of the work to be performed and the reason the work is needed;
(c) Include an estimate of the time period during which the work will occur; and
(d) Provide information on how the electric utility can be contacted.
(3) The limitation on liability provided by this section does not apply unless the pruning or removal complies with rules adopted by the Public Utility Commission relating to pruning or removal. In adopting rules, the commission shall give consideration to the American National Standard for Tree Care Operations adopted by the American National Standards Institute. [2001 c.420 §3]
Note: See note under 758.280.
Structure 2021 Oregon Revised Statutes
Volume : 19 - Utilities, Vehicle Code, Watercraft, Aviation
Chapter 758 - Utility Rights of Way and Territory Allocation; Cogeneration
Section 758.010 - Authority to construct lines and facilities; requirements and conditions.
Section 758.015 - Certificate of public convenience and necessity.
Section 758.020 - Joint occupancy of poles.
Section 758.035 - Commission’s power to enforce joint use of facilities.
Section 758.125 - Duties and rights not altered by ORS 758.120.
Section 758.215 - Definitions for ORS 758.210 to 758.270.
Section 758.225 - Petition, ordinance or resolution for conversion; contents; filing.
Section 758.230 - Assessment procedure; objections to conversion.
Section 758.240 - Contract with utility for conversion.
Section 758.245 - Payment of costs for conversion; removal of overhead facilities.
Section 758.250 - Conversion of facilities on private lands; procedure; payment of costs.
Section 758.280 - Definitions for ORS 758.280 to 758.286.
Section 758.282 - Immunity of electric utility for pruning or removing vegetation in certain cases.
Section 758.286 - Immunity not applicable to liability for cost of abating fires.
Section 758.300 - Definitions for ORS 758.300 to 758.320.
Section 758.302 - Application for exclusive service territory.
Section 758.305 - Exclusive service territories.
Section 758.315 - Water utility service provided by persons not designated by commission; remedy.
Section 758.400 - Definitions for ORS 758.015 and 758.400 to 758.475.
Section 758.410 - Contracts for allocation of territories and customers; transfer of facilities.
Section 758.420 - Filing of contract; hearing on contract; notice.
Section 758.425 - Order of commission on contract.
Section 758.435 - Application for allocation of territory; hearing; notice.
Section 758.440 - Order of commission on application.
Section 758.460 - Assignment or transfer of rights acquired by allocation; approval of commission.
Section 758.470 - Application to cities, municipalities and cooperatives of ORS 758.400 to 758.475.
Section 758.480 - Assumption of obligations arising out of Trojan Nuclear Plant.
Section 758.505 - Definitions for ORS 758.505 to 758.555.
Section 758.515 - Legislative findings.
Section 758.535 - Criteria for qualifying facility; terms and conditions of energy sale.
Section 758.545 - Electric utility required to make good faith effort to transmit energy; remedy.