(2) The Water Resources Department may allow a transfer of the point of diversion under subsection (1) of this section if:
(a)(A) The new point of diversion appropriates ground water from an aquifer that is hydraulically connected to the authorized surface water source;
(B) The proposed change in point of diversion will not result in enlargement of the original water right or in injury to other water right holders;
(C) The use of the new point of diversion will affect the surface water source similarly to the authorized point of diversion specified in the water use subject to transfer; and
(D) The withdrawal of ground water at the new point of diversion is located within 500 feet of the surface water source and, when the surface water source is a stream, is also located within 1,000 feet upstream or downstream of the original point of diversion as specified in the water use subject to transfer; or
(b) The new point of diversion is not located within the distance requirements set forth in paragraph (a)(D) of this subsection, the holder of the water use subject to transfer submits to the department evidence prepared by a licensed geologist that demonstrates that the use of the ground water at the new point of diversion will meet the criteria set forth in paragraph (a)(A) to (C) of this subsection.
(3) Notwithstanding subsection (2) of this section, the department shall allow a transfer of the point of diversion under subsection (1) of this section in the Deschutes Basin ground water study area if:
(a) The new point of diversion appropriates ground water from an aquifer that is hydraulically connected to the authorized surface water source;
(b) The proposed change in the point of diversion will not result in enlargement of the original water right or in injury to other water right holders; and
(c) The use of the new point of diversion will affect the surface water source hydraulically connected to the authorized point of diversion specified in the water use subject to transfer. The department may not require that the use of the new point of diversion affect the surface water source similarly to the authorized point of diversion specified in the water use subject to transfer under this subsection.
(4) All applicable restrictions that existed at the original point of diversion shall apply at the new point of diversion allowed under this section.
(5) The new point of diversion shall retain the original date of priority. However, if within five years after approving the transfer, the department finds that the transfer results in substantial interference with existing ground water rights that would not have occurred in the absence of the transfer, the new point of diversion shall be subordinate to any existing right injured by the transferred water right or permit.
(6)(a) The department shall approve an application to return to the last authorized surface water point of diversion if a holder of a water use subject to transfer submits an application to the department within five years after the department approves a transfer under this section.
(b) The department shall approve an application to return to the last authorized surface water point of diversion after five years of the date the department allows a transfer under subsection (3) of this section if a holder of a water use subject to transfer submits an application to the department, and the return will not result in injury to an existing water right.
(7) For transfers allowed under this section, the department shall require mitigation measures to prevent depletion from any surface water source not specified in the permit or certificated or decreed water right, except that the department may not require mitigation measures if the transfer complies with subsection (3) of this section.
(8) The Water Resources Commission shall adopt rules that prescribe:
(a) The process for reviewing applications submitted under this section;
(b) The persons to whom the department shall provide notice of the receipt of an application submitted under this section; and
(c) The persons who may participate in the process of reviewing applications submitted under this section.
(9) As used in this section:
(a) "Deschutes Basin ground water study area" means the part of the Deschutes River Basin that is designated by the Water Resources Commission by rule.
(b) "Similarly" means that the use of ground water at the new point of diversion affects the surface water source specified in the permit or certificated or decreed water right and would result in stream depletion of at least 50 percent of the rate of appropriation within 10 days of continuous pumping. [1995 c.274 §4; 1999 c.555 §5; 2003 c.705 §1; subsection (9) of 2003 Edition enacted as 2003 c.705 §3; 2005 c.614 §2]
Structure 2021 Oregon Revised Statutes
Volume : 15 - Water Resources, Agriculture and Food
Section 540.020 - Watermasters; appointment; removal; powers of Water Resources Director.
Section 540.030 - Water Resources Director; duties regarding water distribution.
Section 540.045 - Watermaster duties.
Section 540.075 - Office and equipment for watermaster.
Section 540.080 - Assistant watermasters; compensation and expenses; termination.
Section 540.100 - Division of water among users; payment.
Section 540.120 - Lien for wages and expense; notice; foreclosure.
Section 540.145 - Distribution of water; rules; applicability.
Section 540.210 - Distribution from ditch or reservoir.
Section 540.220 - Payment of assistant watermaster.
Section 540.250 - Lien, notice of intent to claim; foreclosure; attorney fees.
Section 540.260 - Lien for wages and expense; enforcement; remedy not exclusive.
Section 540.310 - Ditches and canals; headgates; measuring devices; flumes along lines of ditches.
Section 540.330 - Reservoirs; measuring devices; effect of noncompliance.
Section 540.340 - Reservoir and diversion dam; suitable outlet; effect of noncompliance.
Section 540.355 - Inspection, evaluation and assessment of hydraulic structures.
Section 540.443 - Definitions for ORS 540.443 to 540.491.
Section 540.446 - Dams not subject to ORS 540.443 to 540.491.
Section 540.449 - Construction plan approval; fees; rules.
Section 540.452 - Removal plan approval.
Section 540.455 - Dam inspections and analysis.
Section 540.458 - Notice for owner corrective action to address safety issues.
Section 540.461 - Plan and time frame for corrective action; hearing; proposed and final orders.
Section 540.473 - Application for injunction.
Section 540.479 - Dam owner responsibilities.
Section 540.482 - Emergency action plan for dam with high hazard rating.
Section 540.485 - Actual or potential dam failure.
Section 540.488 - Water Resources Commission duties and powers; rules.
Section 540.491 - Dam owner or operator liability.
Section 540.505 - Definitions.
Section 540.532 - Request for change in point of diversion to reflect historical use; requirements.
Section 540.533 - Application for exchange of water.
Section 540.537 - Order allowing exchange; order terminating exchange.
Section 540.541 - Delivery and use of water under exchange.
Section 540.570 - Temporary transfers within districts; procedure; fee.
Section 540.572 - Application of certificated water elsewhere within district; notice.
Section 540.574 - Petition for approval of transfer.
Section 540.576 - Notice of petition; protest; user rights.
Section 540.578 - Filing of protest; hearing on proposed transfer.
Section 540.585 - Temporary transfers within Deschutes River Basin; procedure; fee.
Section 540.587 - Report on implementation of temporary transfer provisions.
Section 540.641 - Protest of cancellation; procedure.