(a) The recommended base efficiency package for the structure. A base energy package may include improvements to existing supply lines and equipment.
(b) Any optional package recommended for the structure.
(c) The estimated net monthly cost to the applicant when energy savings, project repayment costs, tax or other incentives, loan offset grants, base efficiency package fees and other relevant economic factors are considered.
(d) The monthly cost to the applicant to repay the loan principal and finance charges.
(e) If the base efficiency package or recommended optional package includes the use of nontraditional technology, a description of the nontraditional technology.
(2) A base efficiency package or optional package may not provide for achieving energy efficiency upgrades through the use of appliances or other equipment that lack sufficient relationship to the structure to be subject to a fixture filing or real property lien.
(3) The projection or other evaluation shall state in a clear and conspicuous manner:
(a) That the estimated net monthly cost to the applicant contained in the projection or other evaluation does not represent a guarantee of project performance or results; and
(b) That no liability attaches to the department, any state agency or officer, the sustainable energy project managers or any utility if actual energy savings are less than the estimated savings or if the construction process or constructed project is unsatisfactory in any way.
(4) If the base efficiency package or recommended optional package includes the use of nontraditional technology, the projection or other evaluation shall include a statement that the technology is nontraditional, initialed by the prospective loan applicant.
(5) An energy efficiency and sustainable technology loan may be used only for a project constructed by a primary contractor certified under ORS 701.119.
(6) Prior to the disbursement of the loan moneys to the primary contractor, a sustainable energy project manager or other person approved by the department shall verify that the small scale local energy project has been completed in a manner consistent with energy efficiency and sustainable technology loan program requirements. If this state or any agency of this state adopts or recognizes an energy efficiency scoring system for buildings, the department may require that the verification described in this subsection include the determination of an energy efficiency score for the property benefited by the project.
(7) The department shall periodically consult with primary contractors certified under ORS 701.119 for the purpose of updating average cost and projected savings figures used for energy savings projections or other evaluations under this section. The department shall encourage the use of methods for conducting energy savings projections or other evaluations under this section that are cost-effective and time-effective, take advantage of economies of scale and produce results that are accurate and are replicable for equivalent base energy packages. [2009 c.753 §27; 2010 c.92 §3; 2013 c.8 §3]
Structure 2021 Oregon Revised Statutes
Volume : 13 - Housing, Games, Environment
Chapter 470 - Small Scale Local Energy Projects
Section 470.050 - Definitions.
Section 470.060 - Application for financing; content; fee.
Section 470.065 - Confidentiality of information provided by or on behalf of applicant.
Section 470.070 - Small Scale Local Energy Project Advisory Committee.
Section 470.140 - Rulemaking authority; biennial report.
Section 470.150 - Loan contract; security; content.
Section 470.155 - Loan contract in form of intergovernmental agreement; provisions.
Section 470.170 - Security for loan.
Section 470.270 - General obligation refunding bonds.
Section 470.280 - General obligation bond repayment from sinking fund.
Section 470.310 - Procedure if sinking fund inadequate.
Section 470.525 - Quarterly report.
Section 470.530 - Qualifications; duties; certification program.
Section 470.535 - Applications for certification as project manager; selection factors.
Section 470.545 - Appeal of certification decision; fee.
Section 470.555 - Project managers; contract with qualified third parties; coordination.
Section 470.560 - Rules; certification standards; provision for preferred service providers.
Section 470.570 - Energy Project Supplemental Fund; sources; uses.
Section 470.575 - Jobs, Energy and Schools Fund; sources; uses.
Section 470.580 - Energy Project Bond Loan Fund; sources; uses.
Section 470.585 - Energy Revenue Bond Repayment Fund; uses.
Section 470.590 - Proposals; selection.
Section 470.610 - Issuance of bonds; written declarations of State Department of Energy.
Section 470.615 - Payment of bonds.
Section 470.620 - Bond pledges; trustees.
Section 470.630 - Form of disbursement; conditions for issuance.
Section 470.640 - Amount of loans; exceptions.
Section 470.645 - Application for loan; contents.
Section 470.650 - Residential small scale local energy projects; weatherization program.
Section 470.655 - Project initiation fee; base efficiency package fee; rules.
Section 470.660 - Investor-owned utilities; requirements of system; rules; waiver.
Section 470.665 - Consumer-owned utilities; requirements of system; rules; waiver.
Section 470.675 - Cost eligibility for ratemaking purposes; loan repayment charges.
Section 470.680 - State Department of Energy to identify forms of acceptable security.
Section 470.685 - Recording liens; foreclosure of liens; attorney fees and costs.
Section 470.700 - Use of loan offset grant moneys; alternate mechanisms.
Section 470.710 - Apprenticeship and job training.
Section 470.715 - Costs of adopting rules.
Section 470.720 - Loan program information to be provided by utilities; rules.
Section 470.800 - Clean Energy Deployment Fund; sources; uses.
Section 470.805 - Renewable Energy Development Subaccount; sources; uses.
Section 470.810 - Clean energy deployment program; prevailing wage requirements; rules.